background image

Advisory MTD-144

  

                                                 2 of 2

1

2

3

3

3

3

3

3

3

3

Counter Weight
From 42/46” or 50”

Stationary Solid Front Axle
Shown For Reference Only

FIGURE 1

two (2) 3/8-16 Nylon Lock Flange Nuts from item # 3 
(

689-00325

) Hardware Pack as shown in Figure 1. Do 

Not tighten hardware at this time.

5. Install the weight brackets with counter weight to the 
stationary solid front axle using the two (2) 5/16-18 x 
3.25” Hex Head Cap Screws and two (2) 5/16-18 Nylon 
Lock Flange Nuts from item # 3 (

689-00325

) Hardware 

Pack.

6. Tighten all hardware securely from steps 4 and 5.

7. Finish following the instructions provided with the 
42/46”  or 50” RZT Bagger assembly.

Installation Instructions:

1. Follow the instructions provided with the 42/46” or 50” 
RZT Bagger assembly.

2. Disregard the section of instructions for installing the 
counter weight provided with the 42/46” or 50” RZT Bag-
ger assembly.

3. Follow steps 4 through 6 for installing the counter 
weight provided in the 42/46”  or 50” RZT Bagger assem-
bly while using the newly ordered LH and RH Weight 
Mounting Brackets and Hardware Pack.

4. Install item #1 (

703-09197-0637

) Left Hand Weight 

Mounting Bracket and item # 2 (

703-09193-0637

) Right 

Hand Weight Mounting Bracket to the counter weight 
from the 42/46” or 50” RZT Bagger assembly using the 
two (2) 3/8-16 x 2.50” Hex Head Cap Screws and

5/16-18 x 3.25”
Hex Head
Cap Screw

5/16-18 x 3.25”
Hex Head
Cap Screw

5/16-18
Nylon Lock
Flange Nut

5/16-18
Nylon Lock
Flange Nut

3/8-16
Nylon Lock
Flange 

3/8-16
Nylon Lock
Flange 

3/8-16 x 2.50”
Hex Head
Cap Screw

3/8-16 x 2.50”
Hex Head
Cap Screw

Bagger Assembly

Отзывы: