MSA PS-103 Скачать руководство пользователя страница 14

«NPK Morsvyazavtomatica» LLC

  

 

          

Operating manual

 

Page 14 

 

4

 

CURRENT REPAIR OF THE PRODUCT  

4.1

 

G

ENERAL DESCRIPTION 

 

Operability of the Product is indicated by presence of piano type switch backlight, 

located on the casing.  

To diagnose the problem, see table 9. 

If you cannot diagnose the problem, contact the Manufacturer’s service centre.  

4.2

 

S

AFETY FEATURES 

 

Any repair works must be provided by personnel examined and received proper 

qualifications in the area of the occupational safety. 

Check grounding of the PSU before providing any repair works. 
It is PROHIBITED to put a poster “DO NOT switch on! Under Operation!”, when 

power supply switch is in OFF position. 

Replacing damaged parts, boards, modules is 

PROHIBITED

 if power supply 

of the repaired unit is on 

 

 

Installation, aligning and repair works are 

PROHIBITED

 in the room, where 

less than 2 people are present

 

4.3

 

C

URRENT REPAIR OF THE 

P

RODUCT 

 

The list of malfunctions that can be eliminated by own employees is represented 

in table 9. 

The repair of other malfunctions can be done only by Manufacturer’s specialists or 

Manufacturer’s authorized representatives.  

Table 9 – The list of possible malfunctions and troubleshooting   

Malfunction  

Possible reasons 

To be done 

Voltage is absent on 
the PSU output when 
SB is switched off  

Power  supply  voltage  is  ab-
sent  (piano  type  switch 
doesn’t glow) 

Check the power cable connection  

Supply  the  power  (a  circuit  breaker  on  the 
power mains switchboard might be probably 
switched off) 

 

Fuse malfunction (PS-103) 

Replace the fuse  

Circuit breaker is switched 
off  
(PS-103-20) 

Take off the PSU cover, switch on the circuit 
breaker inside the PSU  

Содержание PS-103

Страница 1: ...v 0 7 NPK Morsvyazavtomatica LLC Power Supply unit PS 103 PS 103 20 Operating manual St Petersburg...

Страница 2: ...g 9 1 6 Packaging 9 2 USAGE OF THE PRODUCT 9 2 1 Operational constraints 9 2 2 Usage preparations 10 2 3 Usage of the product 11 3 TECHNICAL SERVICE 12 3 1 General description 12 3 2 Safety features 1...

Страница 3: ...Product PSU In addition to the instructions given in this document the safety regulations and rules applicable in the field shall be observed Only those who have read and understood this document and...

Страница 4: ...put voltage AC 50 60 Hz V 220 110 at option 10 Standby power from batteries V DC 24 Output voltage V DC 18 31 Rated load current 10 20 Rated power W output 190 400 consumed 240 450 Alarm output dry co...

Страница 5: ...Controls and indication The layout of the PSU s key functional elements controls and indication are rep resented in Figures 1 2 Figure 1 Functional elements controls and indication of PS 103 Figure 2...

Страница 6: ...ed to PS 103 and PS 103 20 terminals standby power is supplied from backup power sources to provide uninterruptible opera tion of the equipment connected to the PSU see figures 3 4 Caution The PSU sha...

Страница 7: ...r Terminal Description XS1 1 Alarm unit connection 2 3 XS5 1 24 V DC SB connection 2 0 V 3 Ground connection XS2 1 24 V DC to connect load 3 2 0 V 3 Ground connection XS3 1 24 V DC to connect load 2 2...

Страница 8: ...supplies power from SB to the external signaling unit Figure 4 Connection diagram of PS 103 20 Table 4 Description of connector terminals PS 103 20 Connector Terminal Description X9 1 Alarm unit conne...

Страница 9: ...t coating damage 1 5 MARKING AND SEALING The nameplates are located on the Product where the user can find the name serial number date of manufacturing weight protection degree output voltage and out...

Страница 10: ...g the units on the staff shall observe visually the cable integrity and initial position of the controls on the front panels check the absence of dust and dirt on the Product casing clean with a soft...

Страница 11: ...transfer piano type switch to ON position If you use PS 103 20 additionally transfer a circuit breaker inside the casing to ON position check load operation To switch the PSU off provide the followin...

Страница 12: ...rk is obligatory Table 7 Checklist 1 Visual check of the Product To be done Routine Man hours per 1 Product Visually examine the Product 1 check completeness and appearance of the Product mechanical d...

Страница 13: ...3 take the voltage on the load terminals 1 person 5 mins 3 4 PRESERVATION The Product and set of operational documents are stored in preserved condition in Man ufacturer s packaging boxes The time of...

Страница 14: ...if power supply of the repaired unit is on Installation aligning and repair works are PROHIBITED in the room where less than 2 people are present 4 3 CURRENT REPAIR OF THE PRODUCT The list of malfunct...

Страница 15: ...rage conditions 5 40 with the concentration of dust oil moisture and aggressive impu rities in the air within the required limits for the working areas of production facilities After storage or transp...

Страница 16: ...sportation in sealed and heated compartments sea transportation in dry service premises The units must be transported in compliance with transportation rules applicable for each means of transport Dur...

Страница 17: ...d an overage equipment unit to the manufacturer for its further disposal Proper disposal of Product components allows avoiding possible negative envi ronmental and health impacts and it also allows fo...

Страница 18: ...tica LLC Operating manual Page 18 ANNEX A MANDATORY OUTLINE AND INSTALLATION DIMENSIONS OF THE PRODUCT Figure A 1 Outline and installation dimensions of PS 103 Figure A 2 Outline and installation dime...

Отзывы: