background image

I N S T A L L A T I O N M A N U A L

F 6 5 0 / 8 0 0 G S

MRA-Klement GmbH + Siemens Str. 6 + D-79331 Teningen

Tel.: +49 7663 9389 0 + Email: [email protected]

Thank you for buying a MRA Windshield.

Read this manual carefully and check the parts list for completeness before you begin. We recommend that you have

your screen fitted by an authorised workshop.

Parts List:

Required Tools:

1x Screen

6x Black screws M 5 x 16

2x Black screws M 5 x 20

8x Plastic washers

2x Rubber nuts

2x Metal brackets

Allen key 3mm

Torx 25

Installing your screen :

Stand your motorbike on a level, firm surface.

Remove the six screws and the original screen.

NOTE:

the

washers in the rubber nuts might fall out.

Mount the metal brackets with the screws, plastic

washers and rubber nuts, and align them (Fig. 1).

Position the new fairing screen onto your motorbike;

first, fasten it with the medium M5 x 20 screws, then
those on the metal bracket and then the outer screws,
each with the plastic washers (Fig. 2).

Tighten up all of the screws, and make sure they are still
tight from time to time.

P1

P2

After installation, check that all of the screws are tight; tighten them up if necessary. Repeat this at regular intervals.

Clean the screen with water, neutral soap and a sponge. Do not use solvents, alcohol or spirits to clean the screen as

they will damage it.

© by MRA-Klement GmbH – 08/2011

Отзывы: