75
75
Timing Chart
601HRG Timing Charts
Timing Chart for Heat Recovery Fill Cycle:
1) The heat recovery fill cycle is enabled as soon as the
booster tank is full and has reached the required temperature.
2) The wash tank will fill with hot water from the booster tank.
3) The cycle light will flash during the fill cycle.
4) The machine may fill if the machine is not in cycle; however, the machine
will not fill during the wash cycle lockout period as denoted by
in the chart at the top of the page.
TIMING CHART FOR HEAT RECOVERY FILL CYCLE
Содержание 601HRG
Страница 43: ...35 Digital Temperature Display Board...
Страница 44: ...36 Blank Page This Page Intentionally Left Blank...
Страница 46: ...38 Wash Pump Motor Assembly 1 11 12 2 3 4 5 7 8 9 10 6 13 14 15...
Страница 51: ...43 43 Blank Page This Page Intentionally Left Blank...
Страница 54: ...46 Fill Solenoid Valve 1 2 3 4 9 5 6 7 8...
Страница 56: ...48 Final Rinse Piping 1 2 2 10 7 2 1 1 1 1 1 8 9 4 6 5...
Страница 58: ...50 Heat Recovery Assembly 1 2 3 4 5 6 7 8 9 10 11 13 21 22 22 23 14 12 25 26 19 20 5 5 15 15 24 17 18 16 16 27...
Страница 62: ...54 Booster Heater 3 8 2 2 1 4 5 7 6 9 10 12 11 14 13 11 16 15...
Страница 64: ...56 Booster Hoses and Level Sensor 1 2 8 7 3 4 4 5 6 10 10 10 15 16 17 13 14 12 11 9 9 9 9 9 9 9...
Страница 68: ...60 Power Input Block 1 2 3 4 5 6 7 8...
Страница 70: ...62 Timer Control Board Assembly Rear View Front View 1 10 2 4 4 5 6 2 4 7 8 9 11 12 13 3...
Страница 74: ...66 Control Panel 10 11 12 13 14 3 2 1 4 5 6 7 9 8 8 9...
Страница 76: ...68 Panels 7 8 10 1 2 3 4 5 6 9...
Страница 78: ...70 Door Assembly 1 10 4 5 6 6 7 7 9 9 8 10 2 3 3 5...
Страница 80: ...72 Dish Racks Line Strainer PRV 1 2 3 4...
Страница 82: ...74 74 Electrical Schematic SINGLE PHASE THREE PHASE 6 AMP FUSE...
Страница 84: ...76 Blank Page This Page Intentionally Left Blank...