TROUBLESHOOTING AND REPAIR
25
2
2
RELAY BOARD FUSE
RELAY BOARD
EVAPORATOR FAN
MOTOR CAPACITORS
MAIN WIRE HARNESS
(WIRE ASSEMBLY
TERMINAL BLOCK
DIP SWITCH
CONDENSER FAN
MOTOR CAPACITOR
COMPRESSOR
CAPACITOR
Removal of Electrical Parts in the Control Box
G
T
TB
RB
CB
R
G
CF1
CF2
G
G
G
AP
MF1
IOLF
MF2
IOLF
RTH
THS
DS
IR
J4
J9
10
10
J2
J12
J5
J5
J6
J8
J4
J10
J1
J1
J2
J3
J3
1
2
1
2
CC
CN
CN0
0LC
1
1
1
2
3
1
2
CF3
1
2
HI
LOW
MDP
AC115V
1Ø
60HZ
(AUX1)
(AUX2)
AP
Attachment Plug
TB
Terminal Block
CB
Control Board
RB
Relay Board
MF1
Fan Motor of Evaporator
MF2
Fan Motor of Condenser
MC
Compressor Motor
CF1
Capacitor for Fan Motor of MF1
CF2
Capacitor for Fan Motor of MF1
CF3
Capacitor for Fan Motor of MF2
CC
Capacitor for Compressor
IOLF
Internal Overload Relay of Fan Motor
OLC
Overload Relay of Compressor
DS
Full Drain Warning Switch
THS
Freeze Protection Thermistor
RTH
Room Thermistor
IR
Remote Receiver Board
G
Ground
CN
Connector for Drain Pump (Unit Side)
CNO
Connector of Drain Pump ( Pump Side)
MDP
Drain Pump
AUX1
Auxiliary Connector
AUX2
Auxillary Connector / Jumper
MC
Removal of Electric Box Cover
H. Remove four (4) screws from the electrical
box cover.
10. Removal of Electrical Parts
Содержание Office Pro 10
Страница 1: ...SERVICE MANUAL OFFICE PRO 10...
Страница 3: ...SERVICE MANUAL OFFICE PRO 10...
Страница 4: ......
Страница 6: ...ii...
Страница 8: ...iv...
Страница 10: ...2 GENERAL DESCRIPTION...
Страница 54: ...TROUBLESHOOTING AND REPAIR 46...
Страница 56: ...800 264 9573 www movincool com DSCA P N LA990009 1196...