![MOULDPRO TCU-90L Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/mouldpro/tcu-90l/tcu-90l_user-manualline_1839734031.webp)
[31]
User Guidelines
– TCU-90L
12-06-2019
Vers. 003
Fix the leakage problem, fixed the leakage connect again the pump switch TCU unit will restart automatically.
Another leak detection (designed for oil TCU units) is:
If the process is more than 10 seconds in oil demand (this may be due to a loss level in the TCU unit)
because filling is manual and not incorporating automatic filling in area A the message displayed will be
Will activate the audible alarm by turning off the pump and heating temperature control unit.
Once the user has disconnected the pump switch and confirmed the alarm by pressing
Fix the leakage problem, fixed the leakage connect again the pump switch TCU unit will restart automatically.
10.1 Deactivate Leak monitoring
If the user disables leak monitoring, the letter L (zone B) will not appear.
The alarm will be
disabled.
Alarm can act, whether the process is water or oil but, pump must be running in continues for 2
minutes.
Содержание TCU-90L
Страница 10: ... 10 User Guidelines TCU 90L 12 06 2019 Vers 003 3 2 Rear view ...
Страница 19: ... 19 User Guidelines TCU 90L 12 06 2019 Vers 003 7 Display and Parameter settings Zone A Zone B ...
Страница 38: ... 38 User Guidelines TCU 90L 12 06 2019 Vers 003 17 Electrical diagram ...
Страница 39: ... 39 User Guidelines TCU 90L 12 06 2019 Vers 003 18 Water Circuit Diagram ...
Страница 40: ... 40 User Guidelines TCU 90L 12 06 2019 Vers 003 19 Control Circuit diagram ...
Страница 41: ... 41 User Guidelines TCU 90L 12 06 2019 Vers 003 20 Components and spare part list ...
Страница 42: ... 42 User Guidelines TCU 90L 12 06 2019 Vers 003 ...