6880309U09-A
October 26, 2007
Disassembly/Reassembly Procedures
: Replacement Procedures
6-25
4. Before reassembling the PCB to the chassis [11], put some thermal compound to the back of
the electronic component (Q2018) as shown in
.
NOTE:
Refer
section 6.3: Chassis Thermal Compound Replacement Procedure on page 6-47
Figure 6-44. Position of Electronic Component – Q2018
5. Tilt the main-unit board kit [13] and slide it into place; insert the connector through the
opening provided. Gently push down the PCB to fully seat it. Ensure the main-unit board kit
alignment holes are positioned over the chassis alignment bosses and the Main-unit board kit
is fully seated.
Figure 6-45. Inserting Main-Unit Board Kit into Chassis
Q2018
Содержание PM1200
Страница 1: ......
Страница 2: ......
Страница 6: ...iv Notes ...
Страница 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Страница 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Страница 42: ...October 26 2007 6880309U09 A Notes 4 4 Test Equipment Service Aids and Tools Field Programming Equipment ...
Страница 104: ...October 26 2007 6880309U09 A Notes 6 50 Disassembly Reassembly Procedures Fastener Torque Chart ...
Страница 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Страница 122: ...9 4 Exploded Views and Parts Lists PM1200 Radio Exploded View October 26 2007 6880309U09 A Notes ...
Страница 126: ...October 26 2007 6816532H01 A B 2 Motorola Service Centers Motorola Federal Technical Center Notes ...
Страница 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Страница 137: ......