6880309U09-A
October 26, 2007
Disassembly/Reassembly Procedures
: Replacement Procedures
6-19
12. Using a CR-V PH2 torque driver, fasten the 4 binding head screws, M4x8 SUS B [1] to the
cable relief plate [2] following the sequence as shown in
. (Torqued to
5.8–6.9kgf*cm/ 5–6 in. lbs).
Figure 6-33. Sequence for Installing Cable Relief Plate Screws
6.2.3.2 RF-Interface Board Kit Disassembly/Reassembly
NOTE:
Bracketed numbers are identical to item numbers shown in
6.2.3.2.1 RF-Interface Board Kit Disassembly
1. Disassemble the front panel by following the steps outlined in
Panel Disassembly/Reassembly” on page 6-14.
2. Place the rear of the front panel facing upward on a flat surface and remove the 4 taptite head
screws, M2.6x6 [8] with a CR-V PH1 screwdriver as shown in
Figure 6-34. Installing Remote Radio Control Cable to Front Panel
3. Carefully separate the RF-Interface unit board kit [7] from the front panel [4].
1
3
2
4
1
3
2
4
Содержание PM1200
Страница 1: ......
Страница 2: ......
Страница 6: ...iv Notes ...
Страница 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Страница 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Страница 42: ...October 26 2007 6880309U09 A Notes 4 4 Test Equipment Service Aids and Tools Field Programming Equipment ...
Страница 104: ...October 26 2007 6880309U09 A Notes 6 50 Disassembly Reassembly Procedures Fastener Torque Chart ...
Страница 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Страница 122: ...9 4 Exploded Views and Parts Lists PM1200 Radio Exploded View October 26 2007 6880309U09 A Notes ...
Страница 126: ...October 26 2007 6816532H01 A B 2 Motorola Service Centers Motorola Federal Technical Center Notes ...
Страница 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Страница 137: ......