30/60 Mbps Backhaul
User Guide
Issue 3.1, July 2006
Page 161 of 162
Reset Button Depression
Action
More than 20 seconds, while
the unit is already powered up.
This resets the configuration to factory defaults.
While connecting power for
more than 40 seconds after
power is applied
This resets to factory defaults and erases any user
loaded software images leaving the factory loaded
image intact.
None
Power cycle by switching off at the AC receptacle
(mains). All settings remain the same.
Table 19: Reset Actions
18.1.1
45
Mb
BH
PIDU
AC
Power
The PIDU converts AC (mains) input to the Power Over Ethernet (POE) output by the ODU.
The input supply range for the PIDU is 90V-264V AC, 47-63Hz.
Figure 89: 45 Mb BH PIDU AC Power Input
18.1.2
Cables
and
Connectors
The cable used to connect the PIDU to the ODU can be any standard CAT 5 type provided
that it is suitable for outdoor deployment. Motorola recommends that cables to the
specification below be used.
NEC/CEC: CMR (ETL) C (ETL) 75C SUN RES OIL RES II
Failure to use the recommended (or equivalent) standard of cable may invalidate the
system’s safety certification.
Since the connection from the PIDU to the ODU is part of network infrastructure and is often
operating in a high RF environment due to nearby equipment and the potential for lighting-
induced currents, the use of shielded cables is strongly recommended.
The connection between the PIDU and user’s equipment can be made using any standard
CAT5 patch cable. The RJ45 Ethernet connection is presented as a piece of network
equipment. However as automatic MDI/MDI-X sensing and pair swapping is employed a
crossed or no crossed Ethernet patch cable can be used for connection to another piece of
networking equipment or directly to end user equipment.
Содержание MOTOwi4 Canopy 30
Страница 1: ...Canopy 30 60 Mbps Backhaul User Guide BH30 60 UG en Issue 3 1 July 2006 ...
Страница 73: ...Issue 3 1 July 2006 Page 73 of 162 Figure 41 Fixed Frequency Operation Page 2 ...
Страница 74: ...Issue 3 1 July 2006 Page 74 of 162 Figure 42 Installation Wizard Confirm Configuration Normal ...
Страница 75: ...Issue 3 1 July 2006 Page 75 of 162 Figure 43 Installation Wizard Confirm Configuration Fixed Frequency ...
Страница 92: ...Issue 3 1 July 2006 Page 92 of 162 Figure 58 Spectrum Management Fixed Frequency Screen Master ...
Страница 104: ...Issue 3 1 July 2006 Page 104 of 162 Figure 69 System Reboot ...
Страница 124: ...Issue 3 1 July 2006 Page 124 of 162 Figure 75 Upper Grounding Configuration ...
Страница 137: ...Issue 3 1 July 2006 Page 137 of 162 Figure 83 Connectorized 30 60 Mbps Backhaul Confirm Installation Page ...