Ground Based Access Point (GAP) Hardware Installation
Mounting and bolt congurations
Due to the weight of the GAP components and rack, the supporting structure (oor
deck) must be able to withstand at least 1000 lbs (500 kg). A structural oor support,
such as an iron I-beam, underneath the wooden oor is recommended.
Refer to
for a typical cross - section of the wooden floor bolt mounting to the GAP
cabinet or rack mounting brackets.
Figure 4-2
Wooden oor mounting
ti-cdma-05743-wd.eps
SMALL FLAT
WASHER
M12 X 100 BOL T
INSULATING
WASHER
(OPTIONAL)
LARGE FLAT
WASHER
MOUTING
BRACKET
ISOLATION
PAD
MOUNTING
STRUCTURE
(I BEAM)
M12 NUT
LOCK WASHER
SMALL FLAT
WASHER
(AFFIXED TO
BRACKETS)
PRELIMINARY ILLUSTRATION
68P09286A73-1
4-7
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Содержание MOTOwi4 25600
Страница 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 49: ...Unpacking Chapter 2 Site Preparation 2 14 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 57: ...Cable Lengths Chapter 3 Cable Descriptions 3 8 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 85: ...GAP Cabinet cabling Chapter 6 Optional Equipment 6 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 95: ...Installation checklist Chapter 8 XXXXXXXXXXXX 8 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 97: ...Installation checklist Chapter 9 XXXXXXXXXXXX 9 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 99: ...Installation checklist Chapter 10 XXXXXXXXXXXX 10 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 101: ...Installation checklist Chapter 11 XXXXXXXXXXXX 11 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 102: ...Appendix A Alternate RF Head Installation Procedure 68P09286A73 1 A 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 104: ...Appendix B Alternate RGPS Installation 68P09286A73 1 B 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...