INSTALLATION SITE PREPARATION

04. INSTALLATION

04. INSTALLATION

BARRIER’S FIXATION

01•

 Create a foundation in cement on the 

soil. 

The dimensions on the side image are 

the minimum to maintain

, so they can be 

superiors but never inferiors.

You must leave one or more tubes for the 

cables of the different components to 

pass through the foundation to the barrier 

(photocells, wall starts, key selectors, etc). 

01•

 With the bolts already fixed on the 

cement foundation, respecting the 

dimensions of point 2, place the barrier 

on top of the foundation in a way that the 

screws stay inside and centered with the 

barrier.

02•

 Solder the bolts with bushings on the 

foundation while the cement is still fresh.

It is also necessary to respect the 

dimensions on the side image when 

soldering the bolts, so that the barrier can 

be installed.

02•

 Open the door using the key to unlock 

it, and pull it to the outside.

ALTERNATIVE•

 During installation, you can 

replace the bolts supplied by metal hooks, 

soldering them on the cement foundation 

while it is still fresh.

You must pay attention to the above 

image’s dimensions when placing the hooks.

3•

 Place the fastening metal plates and fix 

the barrier to the ground tightening the 

nuts supplied with the product.

It’s important that this order of installation is respected!

Otherwise we can’t assure the correct installation of the barrier and it may not work 

properly.

500 mm 

(total height 

of 

foundation)

20mm

(height 

of 

foundation 

above soil)

Содержание mbm6

Страница 1: ...v4 0 REV 01 2019 EN INSTALLER AND USER S MANUAL BARRIER MBM6...

Страница 2: ...el of mechanical assemblies in doors and gates and control board programmation He should also be able to perform electrical connections in compliance with all applicable regulations The installer shou...

Страница 3: ...9 04 M16 bolts with bushings 10 04 boom fastening screws 11 02 boom support fastening screws 12 01 RGB LED board 13 01 cover for boom 14 01 installer and user s manual TECHNICAL SPECIFICATIONS 03 OPER...

Страница 4: ...ier s warning light During pausing time while openned warning light emits BLUE light During closing course warning light emits RED light 01 Open the door using the key supplied with the barrier Rotate...

Страница 5: ...the barrier 02 Solder the bolts with bushings on the foundation while the cement is still fresh It is also necessary to respect the dimensions on the side image when soldering the bolts so that the ba...

Страница 6: ...om is fixed use the cover to hide these fastening parts After assembling the boom you must define the length of it so that you can fix the boom support as visible on the image above When the boom s le...

Страница 7: ...on phase 1 as shown on the above image Let it go and it must maintain on that position or rising very slowly If the boom starts to descend or rise adjust the springs untill you can make the boom becom...

Страница 8: ...fixed to the boom s rotation shaft that when openning or closing will activate the micro switches also installed This will cause the control board to stop the barrier when the micro switches are activ...

Отзывы: