INSTALLATION SITE PREPARATION
04. INSTALLATION
04. INSTALLATION
BARRIER’S FIXATION
01•
Create a foundation in cement on the
soil.
The dimensions on the side image are
the minimum to maintain
, so they can be
superiors but never inferiors.
You must leave one or more tubes for the
cables of the different components to
pass through the foundation to the barrier
(photocells, wall starts, key selectors, etc).
01•
With the bolts already fixed on the
cement foundation, respecting the
dimensions of point 2, place the barrier
on top of the foundation in a way that the
screws stay inside and centered with the
barrier.
02•
Solder the bolts with bushings on the
foundation while the cement is still fresh.
It is also necessary to respect the
dimensions on the side image when
soldering the bolts, so that the barrier can
be installed.
02•
Open the door using the key to unlock
it, and pull it to the outside.
ALTERNATIVE•
During installation, you can
replace the bolts supplied by metal hooks,
soldering them on the cement foundation
while it is still fresh.
You must pay attention to the above
image’s dimensions when placing the hooks.
3•
Place the fastening metal plates and fix
the barrier to the ground tightening the
nuts supplied with the product.
It’s important that this order of installation is respected!
Otherwise we can’t assure the correct installation of the barrier and it may not work
properly.