1 • Remove the screw A. 

• Put the boom like on phase 1 as shown on the 

above image. Let it go and it must maintain on 

that position, or rising very slowly. If the boom 

starts to descend or rise adjust the springs untill 

you can make the boom become stabilized.

3 • Put the boom like on phase 2, phase 3, phase 

4 and phase 5 and repeat the same process of 

point 2 for each phase. With the adjustment of 

the springs, you must achieve a stage where you 

can let go the boom in each position you desire 

and it must stay stabilized. The springs must be 

calibrated to sustain the total wheight of the 

boom without the help of the motor. 

4 • Refit the screw A. 

The mechanical limit-switches of the barrier are shown on the image on the 

left. They consist of two rings fixed to the boom’s rotation shaft, that when 

openning or closing will activate the micro-switches also installed. This will 

cause the control board to stop the barrier when the micro-switches are 

activated, one for each type of maneuvers.

Adjust limit-switches:

1 • 

Slightly loosen the screw of the ring you want to adjust, so it becomes 

easier to move.

2 • 

Rotate it to the desired position, so it can activate the micro-switch and 

stop the boom on the correct position.

3 • 

Fasten the ring’s screw you’ve adjusted to fix it on that position.

NOTE • 

 When adjusting the limit-switches you must also need to adjust the 

mechanical stoppers. The mechanical stoppers shown in the image on the 

side, were developed to limit the movement of the arms inside the barrier’s 

body. After adjusting the limit-switches, you must need to adjust the stoppers 

so that the arm shaded on the image touches them as soon as the micro-switches are activated. This will cause 

the stoppers to hold the boom’s weight when it gets to end of course. To make the adjustments, you just need to 

loosen the bolts that fix them, rotate them and fasten the bolts to fix them on that position.

For the correct operation of the barrier, please pay attention to the information in the table:

After installing the barrier, you must verify the position of the boom while closed. If it isn’t aligned 

horizontally when closed, follow the instructions bellow to adjust it.

BOOM LENGTH

NUMBER 

OF SPRINGS

SPRING’S LENGTH AND STEEL DIAMETER

6500 mm

3

1 spring de Ø 5mm with adjustment to 2 cm

2 springs de Ø 6mm with adjustment to 2,5 cm

7000 mm

4

2 springs de Ø 5mm with adjustment to 4,5 cm

2 springs de Ø 6mm with adjustment to 5,5 cm

7500 mm

4

no need to adjust the springs

8000 mm

4

2 springs de Ø 5mm with adjustment to 3 cm

2 springs de Ø 6 mm with adjustment to 3 cm

11000 mm

4

1 spring de Ø 5mm with adjustment to 3 cm

3 springs de Ø 6 mm with adjustment to 3 cm

LIMIT-SWITCHES

Debe desconectar la barrera de la alimentación eléctrica para evitar accidentes.

1 • Loosen the nuts of the extensible arm shown in the image 

of the barrier’s interior.

2 • Insert a small rod on the hole located on the extensible 

arm so you can rotate it more easily.

3 • To level the boom when closed, you just need to rotate 

the extensible arm. If you rotate to the direction shown by 

the arrow of the image, you are reducing it’s size and causing 

the boom to rise. If you rotate on the other direction, you are 

increasing it’s size causing the boom to descend.

4 • When the boom is leveled, you must fasten the nuts of the 

extensible arm to lock it’s length. This will prevent the arm to  

accidentally increase or decrease during the normal usage of the barrier.
NOTE • The development of all mechanical parts was made to assure an opening degree of 90° in whatever 

leveling position you adjust the boom. This means that if you align it horizontally when closed, it will be vertically 

aligned when openned.

(Horizontal level)

You should disconnect the barrier from the electric power. This way there will be no risk of 

activating and an accident occurs.

PHASE 5

PHASE 4

PHASE 3

PHASE 2

PHASE 1

Содержание MBM11

Страница 1: ...V3 1 REV 10 2019 MBM8 MBM11 EN INSTALLER AND USER S MANUAL...

Страница 2: ...LOSING INSTALLATION SITE PREPARATION DIMENSIONS BARRIER S FIXATION BOOM ASSEMBLY 01 SAFETY INSTRUCTIONS 02 PACKAGE 03 THE AUTOMATISM 04 INSTALATION 00 CONTENT INDEX BOOM SUPPORT INSTALLATION TOP COVER...

Страница 3: ...ls etc are susceptible to electric shock by direct or indirect contact with electricity Be cautious when handling the product and observe all safety procedures in this manual It is important for your...

Страница 4: ...er s manual Inside the package you will find the following components MBM8 MBM11 Barrier s Power Supply AC 230V 50 60Hz AC 230V 50 60Hz Motor s Voltage AC 230V AC 230V Power 180W 300W Current 1A 2A RP...

Страница 5: ...tion of the barrier right or left will open or close the boom 20mm height of foundation above soil 20mm height of foundation above soil 500 mm total height of foundation 500 mm total height of foundat...

Страница 6: ...metal plates and fix the barrier to the ground tightening the nuts supplied with the product To assemble the boom you must place the boom on the barrier fixing plate and align the four holes on each p...

Страница 7: ...de 3 The hooks that secure the top cover are also rotated and release the cover Before starting the tuning of the springs is necessary to remove the screw identified in the illustration ADJUSTMENT To...

Страница 8: ...ts you just need to loosen the bolts that fix them rotate them and fasten the bolts to fix them on that position For the correct operation of the barrier please pay attention to the information in the...

Страница 9: ...nnected directly to the power supply works properly The order to connect the capacitor s cables on the barrier s cables is not important You just have to connect one on the Brown cable and the other o...

Отзывы: