Drill a hole in the ground to create a concrete foundation. The dimensions presented
are recommended in foundation creation. You should leave tubes in the middle for the
passage cables for power and accessories.
04
•
Apply the column with the screws to the concrete base. You must ensure that the
column is level (use a level).
GROUND
NUTS
SCREWS
NUTS
CHAINLIFT
CHAINLIFT
CHAINLIFT
VÃO
03. INSTALLATION
OPERATOR INSTALLATION
For the correct functioning of the automatism, it is necessary to take into
the dimensions mentioned in the image. Leave a 200mm free space on the
door side of each automatism, so you can open the automatism door
whenever necessary.
05
•
Proceed in the same way to install the second column of the automatism.
01
•
Measure the desired distance from one column to another automatism column
(chain length) before installation.
CEMENT SHOULD
BE FRESH
INSTALLATION OF
THE CHAIN
EXISTING FOUNDATION
*If you are installing the automatism
in an existing foundation, screw the
fixing plate to the floor, using
suitable screws and bushings
(not supplied in the kit).
INSTALLATION OF
THE GUTTER
03
•
Fill the hole with concrete and smooth the top where you will fix the column.