Installation
13
Manual # 42-02-U001, Rev C1
1. Check that factory wiring listed in the Connections On columns in the following table
matches the voltages specific to your installation. If they do not match, move the con-
nections to those specified for your voltage.
2. Connect the jumper wires (included in shipment) to transformers T1 and T2 according
to the Jumpers column in the following table. Verify that the factory default line settings
match your line voltage as indicated in the Connections column. Change if necessary.
Note
Jumpers used to configure the transformers are provided. They are in a plastic bag, usually
taped to a transformer in the main TAPS enclosure.
Table 5. Transformer Jumper Schedule, 3 kVA TAPS Units
Line
Voltage
Transformer T1
Transformer T2
Connections
Jumpers
Connections
Jumpers
208 VAC
H1, H6
H1 to H5
H2 to H6
H1, H6
H1 to H5
H2 to H6
220 VAC
H1, H7
H1 to H5
H3 to H7
H1, H7
H1 to H5
H3 to H7
240 VAC
H1, H8*
H1 to H5
H4 to H8
H1, H8*
H1 to H5
H4 to H8
416 VAC
H1, H6
H2 to H5
H1, H6
H2 to H5
440 VAC
H1, H7
H3 to H5
H1, H7
H3 to H5
480 VAC
H1, H8*
H4 to H5
H1, H8*
H4 to H5
* = Factory Default Setting
Содержание TAPS
Страница 6: ...2 Manual 42 02 D001 Rev A 1 September 2003...
Страница 15: ...Installation 9 Manual 42 02 U001 Rev C1 Figure 5 6kVA UPS Enclosure Base Assembly...
Страница 16: ...10 Manual 42 02 U001 Rev C1 Figure 6 6kVA UPS Enclosure Assembly...
Страница 40: ...34 Manual 42 02 U001 Rev C1 6kVA Units The 6kVA unit uses an LCD as well as LEDs...
Страница 42: ...36 Manual 42 02 U001 Rev C1 6 12 12...
Страница 43: ...TAPS Drawings 37 Manual 42 02 U001 Rev C1...
Страница 44: ...38 Manual 42 02 U001 Rev C1...
Страница 45: ...TAPS Drawings 39 Manual 42 02 U001 Rev C1...