background image

Motion MCW with MediaWave Computer 

– Installation and Assembly Procedure 

 

Document No. 002-15-0010

 

 

Motion Proprietary & Confidential 
Copyright © 2009 Motion Computing, Inc. as an unpublished work 
 

2.8 

Route cables behind the decorative cover 

     

 

2.9 

Slide decorative cover to the bottom of the column 

 

2.10 

Holding cable in the channel and insert second decorative cover in the 
back column channel groves 

Note: The half moon cut out is up 

     

 

Содержание 002-15-0010

Страница 1: ...rsion A Love 2009 10 09 ECN 2420 INITIAL RELEASE A00 PROPRIETARY NOTE THIS DOCUMENT CONTAINS INFORMATION CONFIDENTIAL AND PROPRIETARY TO MOTION COMPUTING AND SHALL NOT BE REPRODUCED OR TRANSFERRED TO OTHER DOCUMENTS OR DISCLOSED TO OTHERS OR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT WAS OBTAINED WITHOUT THE EXPRESSED WRITTEN CONSENT OF MOTION COMPUTING ...

Страница 2: ...OTE WHERE THE ALLEN SET SCREWS ARE LOCATED 7 3 3 SLIDE THE WORK SURFACE DRAWER ASSEMBLY MOUNTING BRACKET INTO THE ADJUSTABLE RAIL LOCATED ON THE FRONT COLUMN 7 3 4 SLIDE THE WORK SURFACE DRAWER ASSEMBLY DOWN THE RAIL TO ABOUT 2 INCHES 4 4 CM FROM THE BOTTOM OF THE RAIL 7 3 5 TIGHTEN THE SET SCREWS 8 3 6 FULLY TIGHTEN THE SET SCREWS 8 3 7 REINSTALL THE DRAWER BY SLIDING IT ONTO THE DRAWER RAILS 9 4...

Страница 3: ...E HOLE IN THE BACK OF THE BATTERY GAUGE HOUSING 16 9 ATTACH THE BATTERY GAUGE MOUNT PLATE TO THE BACK CPU VESA MOUNT PLATE17 10 PLUG IN AND SECURE MONITOR CABLES 18 11 PLUG IN AND SECURE COMPUTER CABLES 18 12 DRESS THE CABLES AT THE MONITOR AND CPU USING CORRUGATED CABLE WRAP SECURING WITH CABLE TIES 19 13 PULL THE EXCESS CABLE LENGTH TO THE BOTTOM OF THE COLUMN 19 14 DRESS THE CABLES AT THE BOTTO...

Страница 4: ...2 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 1 Base with power supply shroud installed 1 1 Remove the plastic Shroud that covers the power supply Tip Setting the wheel locks will help hold the Base assembly in place 2 Column assembly ...

Страница 5: ...Wave Computer Installation and Assembly Procedure 2 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 2 1 Lay base on its back 2 2 Position column above base ...

Страница 6: ... Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 2 3 Insert bolts through the bottom of the cart into the column Thread each bolt before fully tightening any bolt Tighten all four bolts 2 4 Set cart upright ...

Страница 7: ...ntial Copyright 2009 Motion Computing Inc as an unpublished work 2 5 Remove one screw and loosen the other screw of the column top plate 2 6 Insert decorative cover in the back of the column channel groves Note Notice the half moon on the first decorative cover 2 7 Slide decorative cover down to within 24 inches of the base ...

Страница 8: ...tary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 2 8 Route cables behind the decorative cover 2 9 Slide decorative cover to the bottom of the column 2 10 Holding cable in the channel and insert second decorative cover in the back column channel groves Note The half moon cut out is up ...

Страница 9: ...ntial Copyright 2009 Motion Computing Inc as an unpublished work 2 11 Slide the decorative cover down so it touches the first cover 3 Installing the work surface and drawer Note The work surface and drawer come pre assembled 3 1 Remove the drawers by pressing the plastic release tabs on the inside of the drawer glide rails ...

Страница 10: ... Copyright 2009 Motion Computing Inc as an unpublished work 3 2 Note where the Allen set screws are located 3 3 Slide the work surface drawer assembly mounting bracket into the adjustable rail located on the front column 3 4 Slide the work surface drawer assembly down the rail to about 2 inches 4 4 cm from the bottom of the rail ...

Страница 11: ...ocedure 8 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 3 5 Tighten the set screws 3 6 Fully tighten the set screws Note Failure to fully tighten the set screws may result in the assembly dropping ...

Страница 12: ...ve Computer Installation and Assembly Procedure 9 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 3 7 Reinstall the drawer by sliding it onto the drawer rails ...

Страница 13: ...otion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 4 Assemble the CPU Monitor VESA Mount assembly 4 1 Attach metal spacers to the front CPU VESA Mount plate corners 4 2 Place nylon spacers over the Monitor VESA Mount plate threaded inserts where arrows indicate ...

Страница 14: ...ed work 4 3 Insert screws through the front CPU VESA Mount plate hole and through the nylon spacers threading them into the Monitor VESA Mount plate threaded inserts 4 4 Attach the Flush Tilting VESA Mount bracket to the back CPU VESA Mount plate 4 5 Place the Media Wave Computer onto the front CPU VESA Mount plate evenly spaced between the metal spacers and connectors facing down ...

Страница 15: ...ential Copyright 2009 Motion Computing Inc as an unpublished work 4 6 Attach the back CPU VESA Mount plate to the front CPU VESA Mount plate using the threaded metal spacers attached to the front plate 5 Install the Monitor CPU Mount assembly by sliding the Flush Tilting VESA Mount bracket into the front of the column rail ...

Страница 16: ...2009 Motion Computing Inc as an unpublished work 5 1 Position the VESA Mount bracket about one inch from the top of the column rail and secure by tightening the set screws 6 Assemble the Battery Gauge housing Note position of housing square cutout offset to left and cover hole offset to bottom 7 Assemble the Mounting plate and Battery Gauge ...

Страница 17: ... No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 7 1 Place the Mounting plate with the back side facing up and set the Battery Gauge plate over the fixed mount screws 7 2 Attach the Battery Gauge housing to the Mounting plate ...

Страница 18: ...ment No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 7 3 Turn over the Mounting plate assembly remove the adhesive cover paper from the back of the Battery Gauge and adhere the Battery Gauge to the Mounting Plate assembly ...

Страница 19: ... and Assembly Procedure 16 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 8 Plug the RJ45 Battery Gauge cable into the jack through the hole in the back of the Battery Gauge housing ...

Страница 20: ...puter Installation and Assembly Procedure 17 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 9 Attach the Battery Gauge Mount plate to the back CPU VESA Mount plate ...

Страница 21: ...ter Installation and Assembly Procedure 18 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 10 Plug in and secure monitor cables 11 Plug in and secure computer cables ...

Страница 22: ...19 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 12 Dress the cables at the Monitor and CPU using corrugated cable wrap securing with cable ties 13 Pull the excess cable length to the bottom of the column ...

Страница 23: ...ocument No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 14 Dress the cables at the bottom of the column using corrugated cable wrap securing with cable ties and pulling the excess cable length into the sheet metal base ...

Страница 24: ...sembly Procedure 21 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 15 Install Batteries with terminal pointing out If the batteries are turned in the thermal sensors will read incorrectly ...

Страница 25: ...dure 22 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 16 The unpainted side of the thermal sensor must be in contact with the battery post 17 Make sure battery connections are tight on both batteries ...

Страница 26: ...MediaWave Computer Installation and Assembly Procedure 23 Document No 002 15 0010 Motion Proprietary Confidential Copyright 2009 Motion Computing Inc as an unpublished work 18 Reinstall the shroud and column top plate ...

Отзывы: