Motan C15SPV 24MEFM Скачать руководство пользователя страница 13

13

INSTRUCTIONS FOR THE FINAL USER (BENEFECIARY)

The control, protection and automation elements provide:

*

The flame ignition

*

The flame sensing

*

The temperature and water signalling in the boiler

*

The temperature regulation on the heating circuit

*

The temperature regulation on the DHW circuit

*

The pump starting at the heating water demand

*

The safety of the boiler at overheating and overpressure

*

Draft deficiency (air pressure switch)

*

The boiler safety at minimum water level  (water pressure switch)

*

The DHW demand sensing (flowmeter) and giving priority to this discharge

The indicators and the operating buttons are placed on the control board.
The chronothermostat or the room thermostat may be installed on demand.

UTILIZATION INSTRUCTIONS

The control board

Display board LCD in the user module

SW8

SW 7

SW2

Button  -  Operation function

This button shuts down/ opens out the boiler (the boiler is still connected to the

tension). In the module Off the board is deactivated completely excepting the symbol 1.
When activating, the activated symbols appear on the LCD display while the symbol 1
disappears

Summer/ winter: Pressing this button, you select summer or winter module. The activated

symbols are two for the summer (in this module, any value of the temperature is
displayed in stand-by, while, if there is any DHW demand, the DHW setting temperature
will appear) and 3 for the winter module.

Reset from blocking: reset if the boiler is in Err E2, otherwise there will be no result.

On/Off:

Fig 1. The control board for OPTIMUS MT

SW3

DISPLAY

SW 5

SW1

SW6

SW4

SW7

SW2

SW8

Содержание C15SPV 24MEFM

Страница 1: ...lexandru cel Bun Neamt District Postal Code 617511 Romania Phone 40 233 24 17 46 233 24 19 33 Fax 40 233 24 19 29 E mail www motan ro office vaduri kober ro TECHNICAL INSTRUCTIONS FOR INSTALLATION USA...

Страница 2: ...ditional facilities that may be obtained by Handing over to the beneficiary Recommendations for the yearly checking Marking documents packing storage transport quality and warranty conditions Marking...

Страница 3: ...tope interior ceramics fibre lined is designed to allow the transfer to the exchanger with less heat leakages In case of the CH circuit of the two heat exchangers type the heat resulted from fuel gas...

Страница 4: ...o be consulted by the new user installer In case of some components damaging there will be used only the original components You must have the manufacturer s acceptance to use some components from ano...

Страница 5: ...ption Weight Heat exchanger output 0 5 i 3 bar 40 80 C 3 4 1 2 3 4 275 415 700 850 7 L Central heating Minimum and maximum admitted pressure Temperature on the heating circuit Connections inlet outlet...

Страница 6: ...the copper pipe 14x1 is stainless made forced or atmospherics with 11 cannular inclines and it runs with fuel gas NG or LPG The burner output is set in a modulated system by means of a gas modulating...

Страница 7: ...line the relief valve of the circuit is designed to reduce the pressure from the heating circuit and to open at 3 bars full pressure the ventilation circuit of the installation is made of an air rele...

Страница 8: ...er of the boiler running see the attached drawing the measuring and pilot cells of the functional parameters for the boiler which sends the temperature signal to the electronic control block of the he...

Страница 9: ...stallation we must be aware of the hydraulic features of the pump 9 The hydraulic characteristic of the pump Pressure pump P mca Pump output Q mc h the third stage of the speed the second stage of the...

Страница 10: ...nstalling activities It is important to pay attention to the pipes dimensions head losses and heating elements while designing the heating system The installation filling up must be done with softened...

Страница 11: ...low two operations The setting from the electronic board which is performed by positioning the J6 jumper see the Electrical Diagram on the two pines LPG module The J6 jumper is situated on a single pi...

Страница 12: ...o the current standards The technical instructions should be studied before mounting installing starting or servicing It s forbbiden to install the boiler without earthing THE COUPLING FOR SCAVENGING...

Страница 13: ...ostat may be installed on demand UTILIZATION INSTRUCTIONS The control board Display board LCD in the user module SW8 SW 7 SW2 Button Operation function This button shuts down opens out the boiler the...

Страница 14: ...tting will decrease While visualizing the set point by the heating the symbol 7 is flickering DHW Pressing the button once the preset temperature of the DHW is displayed if you keep pressing the setti...

Страница 15: ...ing Symbol 13 inermitent the conthrol system of boiler is achieving the mentain of temperature in the primary circuit as so at the request of DHW the time necessary for reaching the setted temperature...

Страница 16: ...s irregularity disappears only pressing the button SW3 In case the limit thermostat LT is activated the system will shut down automatically and the intermittent symbol Err E8 occurs on the control pan...

Страница 17: ...in case due to some disturbances the water temperature from the boiler will be below zero degree for more than 2 3 hours the boiler the heating installation and the domestic water installation will b...

Страница 18: ...mmended temperature C 90 80 70 60 50 40 30 20 10 0 40 20 0 20 40 Outdoor temperature C Recommended temperature C T amb 30 C Ke 35 Ke 5 T amb 10 C The heating circuit temperature diagram depending on t...

Страница 19: ...signed by the authorized person too who performs the putting into service who trained The person who performs the starting has the right of refusing the putting into service of the boiler if he estab...

Страница 20: ...on and setting by the authorized personnel The yearly examinations are achieved on beneficiary demand and at the expense of the beneficiary the first year examination is compulsory to maintain the gua...

Страница 21: ...ere is no flame Defective Defective Defective The component Temperature sensors The gas valve The heat exchanger Ignition ionization electrode Parasite spark Replace the ignition ionisation electrode...

Страница 22: ...s lay out is through a below 0 C area and it froze there is air in installation E2 E2 The user calls the authorized service unit he belongs to The user calls the authorized service unit he belongs to...

Страница 23: ...s boiler with forced draft MAXOPTIMUS C15SPV24MEFM THE Coupling 1 DHW inlet CH turn DHW gas supply cold water CH return 2 DHW outlet 3 Central heating turn 4 Central heating return 5 Gas supply 1 2 1...

Страница 24: ...zation electrode 5 electrical pump with exhauster 6 burner 7 gas modulator 8 3 bar safety valve 9 filling valve 10 flowmeter for the sanitary circuit 11 automatic by pass 12 3 way valve 13 temperature...

Страница 25: ...ings diagram for the wall hung gas boiler with forced draft OPTIMUS MT C15 SPV 24 MEFM Plan 3 25 1 2 700 65 51 64 65 A B C D E 3 4 3 4 3 4 1 2 1 2 415 226 189 Panta 3 aprox 2 134 75 280 Gaz Apa 125 15...

Страница 26: ...ical flue system applications for the wall hung gas boiler with forced draft C15SPV24MEFM 26 C12 C12x C12 C12x C82 C32 C32x C42 C22 C22 COAXIAL FLUE TWIN FLUE Lmin 1m Lmax 3m Lmin 1m Lmax 5m Lmin 1m L...

Страница 27: ...TR 2 EARTH FLAME ELECTRODE FAN JP 1 CH PROBE DHW PROBE EXT PROBE FLOWMETER RRESSURE TRANSDUCER MODULATOR COIL CRONO TERMOSTAT OPEN THERM 961 INTERFACE APS GND VCC GAS VALVE HALL SENSOR SAFETY THERMOS...

Отзывы: