Mostec M2740 Скачать руководство пользователя страница 5

 

 

 

3.4 Connecting the BNC cable to simulator 

 

 

1. Insert the BNC connector of the cable over the BNC connector socket on the simulator.  

 

2. Make sure the slots of the connector are in line with the posts of the socket.   

 

3. Slide the BNC connector of the cable over the socket and rotate the connector clockwise until 
it locks.   

 

4. To remove cable, push and rotate the connector counterclockwise.  

 

5. While holding onto the metal part of the connector, pull it away from the simulator.  

 

6. Be careful not to use excessive force.   

 

CAUTION:  Do not pull on the cable cord or the cable wires might disconnect.  

 

  

 

 

Figure 6: BNC cable connection to the simulator 

 

  

   

  

Содержание M2740

Страница 1: ...INSTRUCTION MANUAL pH Simulator...

Страница 2: ...manual provides a step by step guide to operate the simulator 2 Display and Keypad Function 2 1 Display The display consists of 16 sets of labeled LED for the selection of pH and mV values The displa...

Страница 3: ...ation 3 1 Inserting Removing Rubber Boot 1 To remove simulator from rubber boot push out from the bottom edges of simulator until it is completely out of boot Ensure that the BNC cables are not connec...

Страница 4: ...polarity of battery before inserting into position 3 After replacement place cover back and press down until it locks tight Figure 4 Inserting the batteries 3 3 Battery Replacement A low battery LED...

Страница 5: ...lide the BNC connector of the cable over the socket and rotate the connector clockwise until it locks 4 To remove cable push and rotate the connector counterclockwise 5 While holding onto the metal pa...

Страница 6: ...eters 1 Connect the BNC end connector of your simulator to the pH ORP meter 2 Switch the simulator on by pressing the ON OFF button The 7 00 LED will light up indicating that the pH 7 00 simulation va...

Страница 7: ...1 mV High Impedance Test Hi Z 1 G ohm at 4 01 pH 10 01 pH Buffer Set Standard Simulation Value USA NIST Display LED Orange lighting Output BNC Connector Power Requirements 4 AAA 1 5V Batteries Operat...

Страница 8: ...cation or misuse Operation outside of the environment specifications of the products 8 Return of Items Authorization must be obtained from our Customer Service Department or authorized distributor bef...

Отзывы: