
The Specialist In Drum Handling Equipment
Model 410-125
Heavy-Duty Hydra-Lift, 72”, DC Power Lift, Manual Tilt
operator’s Manual for Morse Heavy-Duty Hydra-Lift Karrier Model 410-125
serial number 1210 to ____ (MMYY)
morsedrum.com
Copyright 2021 - Morse Mfg. Co., Inc.
Form OM410-125 (1210-____) (Updated 6 Jul, 2021)
4
WARNING
- Watch out for Pinch Points
Stay clear of moving parts. Operator should remain behind the push handle during the lift operation.
Figure 3.2
Floor Lock
The step-down floor lock is located behind the base (figure
3.1). To activate, step down on the floor lock until it locks in
the down position. When the floor lock is activated it pre
-
vents unwanted free wheeling of the unit. Floor conditions
determine the effectiveness of the floor lock. The operator
should verify its holding action before depending on it to
hold.
MoRCInCH
TM
Drum Holder Assembly
The drum holder assembly (or “saddle assembly”) is the
component on the Heavy-Duty Hydra-Lift Karrier that is
intended to hold the drum. The MORCINCH
TM
drum holder
assembly is designed to secure a standard ribbed 55-
gallon steel drum around it’s middle using a cinch chain and
ratchet tightening system. The MORCINCH
TM
drum holder
accepts accessories for handling a plastic drum, a fiber
drum, or smaller diameter drums (see Options on pg. 3).
operating Instructions
1.) Push the Heavy-Duty Hydra-Lift Karrier to the drum.
2.) Using the “LIFT” control as described in “
Machine
Description - Controls
” (page 3) , position the drum
holder assembly with the back band at the middle of
the drum. (Figure 3.1). With the ratchet plate swung
open and the cinch chain hanging from the chain hook,
push the unit until the back band rests firmly against the
drum. Some adjustment to the tilt angle of the saddle
may be necessary to ensure band fits flush on the drum.
3.)
Attaching the drum:
Drape the chain across the front of the drum and engage
a link into the slot in the ratchet (Figure 3.2). Turn the
ratchet clockwise to tighten chain. If ratchet turns until
the pawl is beyond the last ratchet tooth, turn the ratchet
back and slide the next link into the ratchet slot and try
tightening again. The chain must be held tightly against
the drum with the pawl engaged securely in the ratchet
teeth.
4.) Operate the lift function to lift drum clear of floor. Roll to
dispensing location. NOTE: Do not allow the drum to
impact on floor, pouring station, etc. or a spill or damage
could occur.
Figure 3.1