Step #6:
Remove sealing plug from top of hydraulic reservoir and replace it with the breather plug.
Your Hydra-Lift Karrier is now ready for service. Please refer to the operating and maintenance instructions provided.
Step #3:
Tip the tower up so it stands on the casters and wheels.
Step #4:
Lift overhead assembly into position. A drift pin can help align the holes. Insert a greased clevis pin (Part 138-P) through mast cap
and boom. install a 5/8” washer and 3/16” sel-Lok pin in the end of the clevis pin. see figure 3.
Step #5:
Next, connect the jack to the overhead assembly: align ram eye with holes in boom clevis plates and insert a greased clevis pin
with four 5/8” washers. Place another washer on outer end of clevis pin and drive a 3/16” roll pin into the hole at the end of clevis
pin. see figure 4.
STEP 4.
STEP 5.
FIGURE 3.
FIGURE 4.
TwO
wASHERS
RAM
ROLL
PIN
TwO
wASHERS
RAM
ONE
wASHER
ASSEMBLY INSTRUCTIONS FOR 400AM SERIES SPARK RESISTANT HYDRA-LIFT KARRIERS
Serial Number 0802 to 0704
(MMYY)
Please unpack and identify the following parts:
1 each
Tower with hydraulic pump and cylinder, etc.
2 each
Legs with wheels
1 each
Overhead assembly with drum holder, etc.
1 each
Package with hardware
NoTe: The clevis pins and mating surfaces at their joints should be coated with grease during assembly.
Step #1:
Place tower on floor, push-handle down. see figure 1.
Step #2:
attach each leg using two 3/8-16x3” grade 5 bolts, flat washers, and lock nuts as shown. wheels should be parallel when assem
-
bled properly. see figures 1 &2.
wHEELS
PARALLEL
FIGURE 1.
LEG
FIGURE 2.
LEG
MOUNT
PLATE
LOCk
NUT
400AM Series
Spark Resistant Hydra-Lift Karriers
The Specialist In Drum Handling Equipment
Website:
www.morsedrum.com
COPYRIGHT 2005 MORSE MFG. CO., INC.
Form PL 400AM (0802-0704)
(Updated 05/2005)
Page 3