morse 400A-72SS Скачать руководство пользователя страница 5

The Specialist In Drum Handling Equipment

Model 400A-72SS

Stainless Steel Hydra-Lift, 72”, Manual Lift & Tilt

operator’s Manual for Morse Stainless Steel Hydra-Lift Karrier with Manual Lift and Tilt

Model 400A-72SS  Serial number 1210 to ____ (MMYY)

morsedrum.com

Copyright 2019 - Morse Mfg. Co., Inc. 

Form OM400A-72SS (1210-____)   

(Updated 12 Jun, 2019 11:56 AM)

 

5

Assembly Instructions

Step #1: Place tower on floor, push-handle down. See figure 1.

Step #2: Attach each leg (item 4) using two 3/8-16x3” grade 5 bolts 

(item 2), flat washers (item 3), and lock nuts (item 13) as shown. 

Wheels should be parallel when assembled properly. See figures 

1 & 2.

Please unpack and identify the following parts:

1 ea.   Tower with hydraulic pump and cylinder, etc.

2 ea.   Legs with wheels

1 ea.  Overhead assembly with drum holder, etc.

1 ea.  Package with hardware

NOTE: The clevis pins and mating surfaces at their 

joints should be coated with grease during assembly.

Figure 1

Figure 2

Step #3: Tip the tower up so it stands on the casters and wheels.

Step #4: Lift overhead assembly into position. A drift pin can help align the holes. Insert a greased clevis pin (item 12) through mast cap 

and boom. Install a 5/8” washer (item 9) and 3/16” roll pin (item 8) in the end of the clevis pin. See figure 3.

Step #5: Next, connect the cylinder (item 16) to the overhead assembly: Align ram eye with holes in boom clevis plates and insert a 

greased clevis pin (item 12) with four 5/8” washers (item 9). Place another washer (item 9) on outer end of clevis pin and drive a 3/16” roll 

pin (item 8) into the hole at the end of clevis pin. See figure 4.

Figure 3

Figure 4

Step #6: Remove sealing plug from the top of hydraulic reservoir and fill reservoir with included container of hydraulic fluid. Replace seal

-

ing plug with the included breather plug. Your Hydra-Lift Karrier is now ready for service. Please refer to the operating and maintenance 

instructions provided.

Содержание 400A-72SS

Страница 1: ...amera at your receiving dock for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIP PING COMPANY Then you may contact Morse for assis tance with your freight claim Morse Manufacturing will not be held responsible for any damaged freight that is not signed...

Страница 2: ...evel Floors Only For operation only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory au thorization Any modifications may void the warranty This machine was designed to perform a specific job and altera...

Страница 3: ...llon plastic steel or fiber drum with suitable top rim Controls The Morse Hydra Lift Karrier is manually propelled and steered There are two functions for the operator to control Figure 2 3 LIFT and lower function for vertical positioning of the drum 1 TILT function to control the degree of rotation of the drum 2 LIFT and Lower Function To raise the drum Insert pump lever handle into pump socket 1...

Страница 4: ...n on the floor lock until it locks in the down position activates the floor lock When the floor lock is activated it prevents unwanted free wheeling of the unit Floor conditions determine the effectiveness of the floor lock The operator should verify its holding action before depending on it to hold MORcinch Drum Holder Assembly The drum holder assembly or saddle assembly is the component on the H...

Страница 5: ...ting surfaces at their joints should be coated with grease during assembly Figure 1 Figure 2 Step 3 Tip the tower up so it stands on the casters and wheels Step 4 Lift overhead assembly into position A drift pin can help align the holes Insert a greased clevis pin item 12 through mast cap and boom Install a 5 8 washer item 9 and 3 16 roll pin item 8 in the end of the clevis pin See figure 3 Step 5...

Страница 6: ...ly important when lifting an open drum The floor lock should be engaged while dispensing draining When dispensing is complete tilt drum back to upright position Disengage the floor lock and lower the drum to transporting height 6 about 6 off the floor WARNING Stay Clear of Raised Drum NEVER allow anyone to be below any part of a raised drum handler or drum Remain behind the push handle while handl...

Отзывы: