The Specialist In Drum Handling Equipment
Model 400A-72-115
Hydra-Lift, 72”, DC Power Lift & Tilt
Operator’s Manual for Morse Hydra-Lift Karrier Model 400A-72-115
Serial Number 1210 to ____ (MMYY)
morsedrum.com
Copyright 2022 - Morse Mfg. Co., Inc.
Form OM400A-72-115 (1210-____)
(Updated 3 Mar., 2022)
5
CAUTION
– Do Not Transport with Drum Raised
ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING.
The
unit can become unstable when transporting with a raised load.
5.) Lift drum to desired pouring height. Operate the tilt control as described in
“Machine Description - Controls”
to adjust drum attitude.
This is especially important when lifting an open drum. Floor lock should be engaged while dispensing / draining.
6.) When dispensing is complete, tilt drum back to upright position. Disengage floor lock and lower drum to transporting height; about 6”
(15.2 cm) off the floor.
WARNING
- Stay Clear of Raised Drum
NEVER allow anyone to be below any part of raised drum handler or drum. Remain behind push handle
while handling a drum.
WARNING
– Do NOT Disengage the Cinch Chain When Drum is off the Ground
When drum is in upright position, lower drum to floor before releasing cinch chain.
7.) Push unit to drum storage area and lower drum to floor in upright position. Release cinch chain from ratchet by applying pressure to
ratchet handle in clockwise direction with one hand and opening pawl to free ratchet with other hand. Remove cinch chain link from
ratchet.
START-UP Procedure
Machine is shipped with hydraulic fluid.
1.
Install provided hydraulic control levers (threaded rods with black ball handles).
2. IMPORTANT:
BEFORE operation, remove the
RED
shipping plug from the hydraulic reservoir, and replace with the
provided
BLACK
breather.
Operating Instructions
1.) Push the Hydra-Lift Karrier to drum.
2.) Using the “LIFT” control as described in “
Machine Description
- Controls
”, position drum holder assembly with back band
at the middle of drum (Figure 3.1). With ratchet plate swung
open and cinch chain hanging from chain hook, push unit until
back band rests firmly against drum. Some adjustment to tilt
angle of saddle (drum holder) may be necessary to ensure
band fits flush on drum.
3.)
Attaching the drum:
Drape chain across front of drum and engage chain link into
notch in ratchet (Figure 3.2). Turn ratchet clockwise to tighten
chain. If ratchet turns until pawl is beyond last ratchet tooth,
turn ratchet back and slide next link into ratchet notch and try
tightening again. Chain must be held tightly against drum with
pawl engaged securely in ratchet teeth.
4.) Operate lift function to lift drum clear of floor. Roll to dispensing
location. NOTE: Do not allow drum to impact on floor, pouring
station, etc. or spill or damage could occur.
Figure 3.2