The Specialist In Drum Handling Equipment
Model 400A-60-127
Hydra-Lift, 60”, AC Power Lift, Manual Tilt
Operator’s Manual for Morse Hydra-Lift Karrier Model 400A-60-127
Serial Number 400000 to ______
morsedrum.com
Copyright 2022 - Morse Mfg. Co., Inc.
Form OM400A-60-127 (400000-______) (Updated 23 Sep, 2022)
5
CAUTION
– Do Not Transport with Drum Raised
ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING.
The
unit can become unstable when transporting with a raised load.
5.) Lift drum to desired pouring height. Operate the tilt control as described in
“Machine Description - Controls”
(page
3) to adjust the drum attitude. This is especially important when lifting an open drum. The floor lock should be engaged
while dispensing / draining.
6.) When dispensing is complete, tilt drum back to upright position. Disengage the floor lock and lower the drum to trans
-
porting height; about 6” (15 cm) off the floor.
WARNING
- Stay Clear of Raised Drum
NEVER allow anyone to be below any part of a raised drum handler or drum. Remain behind
the push handle while handling a drum.
WARNING
– Do NOT Disengage the Cinch Chain When Drum is off the Ground
When the drum is in the upright position, lower the drum to the floor before releasing the cinch
chain.
7.) Push the unit to the drum storage area and lower to the floor in an upright position. Release the cinch chain from the
ratchet by applying pressure to the ratchet handle in a clockwise direction with one hand and opening the pawl to free
the ratchet with the other hand. Remove the cinch chain link from the ratchet.
Figure 3.2
WARNING
- Watch Out for Pinch Points
Stay clear of moving parts. Operator should remain behind the push handle during the lift operation.
Operating Instructions
1.)
Push the Hydra-Lift Karrier to the drum.
2.) Using the “LIFT” control as described in “
Machine Description - Controls
”
(page 3) , position the drum holder assembly with the back band at the
middle of the drum. (Figure 3.1). With the ratchet plate swung open and
the cinch chain hanging from the chain hook, push the unit until the back
band rests firmly against the drum. Some adjustment to the tilt angle of the
saddle may be necessary to ensure band fits flush on the drum.
3.)
Attaching the drum:
Drape the chain across the front of the drum and engage a link into the notch
in the ratchet (Figure 3.2). Turn the ratchet clockwise to tighten chain. If
ratchet turns until the pawl is beyond the last ratchet tooth, turn the ratchet
back and slide the next link into the ratchet notch and try tightening again.
The chain must be held tightly against the drum with the pawl engaged
securely in the ratchet teeth.
4.) Operate the lift function to lift drum clear of floor. Roll to dispensing location.
NOTE: Do not allow the drum to impact on floor, pouring station, etc. or a
spill or damage could occur.