2
Morrison Bros. Co. ‑ Dubuque, IA ‑ 800‑553‑4840
419EG‑0203 PP
rev. 3-30-2022
Figure 1
5
Clamp the 419EGT installation tool onto template, aligning top edge of tool with this line.
Ensure vertical line A is visible through notch in tool.
Turn each threaded forming screw until
it bottoms out, dimpling the sleeve. Then loosen
screws and remove clamp.
6
7
Clamp the 419EGT installation tool onto template, aligning top edge of tool with this line.
Ensure vertical line B is visible through notch in tool.
Turn each threaded forming screw until
it bottoms out, dimpling the sleeve. Then loosen
screws and remove clamp.
8
Scan QR code for
installation video.
Peel backing off sticker.
1
Align top and bottom tube ends
to this line.
Roll sticker onto tubes.
2
START
HERE
Drill .25″ diameter holes
(Center punch and pilot holes
recommended)
3
A
Slide 419EG sleeve onto template, positioned between dashed lines.
4
B
(then follow the numbered steps)
FOR
ILLUSTRATION
ONLY
Figure 2
Figure 3