
3.0 INSTALLATION INSTRUCTIONS
Step 1: Load Wiring
The SS-MPPT load output connection will provide battery
voltage to system loads such as lights, pumps, motors,
and electronic devices. See
Section 4.4 Load Control
Information
for more details about load control.
LOAD
POSITIVE (+)
LOAD
NEGATIVE (-)
25 AMP
FUSE
Figure 4. Load wiring
Connect load positive (+) and negative (-) load wires to
the system load(s) or load distribution panel as shown in
figure 4. Refer to the wire gauge chart on page 41 of this
manual for correct wire size.
If required, the negative load connection may be
earth grounded. Use appropriate gauge wire and proper
grounding methods for the installation site.
An in-line fuse holder should be wired in series in the load
positive (+) wire as shown. DO NOT INSERT A FUSE AT
THIS TIME.
If wiring the load connection to a load distribution panel,
each load circuit should be fused separately. The total load
draw should not exceed the 15 A load rating