background image

2

1

1

K6862996

2.0 COVER LATCHING at the
      FRONT/CAB END.

Swing the cab clamps (1)
down from the stowed
position and slide 
them toward the
truck bed rail.
Swing the clamps
so the clamp jaw
is under the truck
bed rail.

The clamp jaw must be in 
contact with the metal
truck bed rail, 

Do Not

 secure

to the plastic bed rail or 
bed cap.

Do Not use a wrench or
over-tighten.

Hand tighten until the clamp 
jaw contacts the metal flange,
then tighten an additional
two turns.
Securely tighten both sides.

2.1

2.2

STANDARD BED INSTALL

www.mopar.com

August 20, 2018

Отзывы: