Anchor Jig Assembly

Anchor Jig Kit Parts List

Single Straps 

(4)

Cross Strap 

(1)

3/4" - 10 Bolts 

(4)

3/4" Flat Washers 

(4)

3/4" - 10 Hex Nut 

(20)

Lock 
Washers 

(4)

1.  Thread two (2) 

nuts

 onto each of the (4) 

bolts

 (Figure 1).  The end with 6" of 

clearance will be the top of the 

Anchor Jig

, the end with 1 

½

" clearance will be the 

bottom.

NOTE:  

Because of surface conditions it may be necessary to use leveling nuts.  See 

step 5 below for information.

NOTE:  

The 

Flat Washers

Lock Washers

, and remaining 

Hex Nuts 

 will be used to 

fasten the pole to the 

Anchor Jig.

4.

  

Before using the 

Anchor Jig

 verify that the center to center dimensions between 

the bolts are even (Figure 4).  If not, adjust accordingly.  Firmly tighten all 

Hex Nuts

.

With Leveling Nuts

Without Leveling Nuts

1

1

/

2

"

6"

18"

Figure 1

1 1/2"

2.  Place the short end of each 

Bolt

 into the outside holes of the 

Cross Strap.  

Place 

Hex Nuts 

onto each 

Bolt

 and finger tighten (Figure 2).

3.  Turn the 

Anchor Jig

 over and place 

Single Straps

 over the 

Bolts

 (Figure 3).  Use 

the inside hole of each strap.  Place 

Hex Nuts

 onto each 

Bolt

 and finger tighten.

Figure 2

Figure 3

25

/

32

"

25

/

32

"

11"

diameter

Figure 4

5.

  

If, due to conditions or other requirements, leveling nuts are needed, adjustments 

will have to be made to the 

Anchor Jig

.  Below are diagrams comparing the 

Anchor Jig

 with and without leveling nuts.  Leveling nuts and washers are NOT 

provided with the pole, 

Содержание P1800

Страница 1: ...Bracket Mounts and Poles Installation and Operation Instructions Before attempting to connect or operate this product please read these instructions completely 81 IN5233 12 21 2011 2011 Moog Videolarm...

Страница 2: ...onents can be damaged if improperly handled or dropped If an item appears to have been damaged in shipment replace it properly in its carton and notify the shipper Be sure to save 1 The shipping carto...

Страница 3: ...pect to any Product requiring service during the warranty period which is subjected to any of the following abuse improper use negligence accident lightning damage or other acts of God i e hurricanes...

Страница 4: ...center of the foundation and Anchor Jig during installation Figure 1 1 diameter maximum Figure 1 Figure 1 Wiring conduit 1 Select a suitable site for the P1600 and prepare the pad site using a hole 3...

Страница 5: ...ad unless you re using leveling nuts see Anchor Jig instructions Make sure that the Conduit is in the center of the Anchor Jig Both the jig and the conduit must be securely suspended to prevent shifti...

Страница 6: ...he pole is vertical on all sides Use a bubble level or plumb bob to check 6 Secure the pole to the pad with fasteners Figure 8 5 Place the pole on the pad with the holes on the Transformer Base aligne...

Страница 7: ...o the power transformer Make the appropriate connections Run video and control into the NEMA box through the conduit opening closest to the surge protector Connect video output to the surge protector...

Страница 8: ...ing Power 1 2 3 4 5 6 24 VAC power pre connected 1 RED RX Control Data 2 ORANGE RX Control Data 3 YELLOW TX Control Data 4 GREEN TX Control Data 5 BLUE Alarm 6 GRAY Alarm User Wiring Connections Video...

Страница 9: ...center dimensions between the bolts are even Figure 4 If not adjust accordingly Firmly tighten all Hex Nuts With Leveling Nuts Without Leveling Nuts 11 2 6 18 Figure 1 1 1 2 2 Place the short end of...

Страница 10: ...ousings Poles Power Supplies and Accessories and 5 Years on camera systems SView QView Warriors and InfraRed Illuminators Register Your ProductsOnline Take a few moments and validate your purchase via...

Отзывы: