II. Site Preparation

Select a suitable site for the 

P

OL

E

VATOR™ 

and prepare the pad site 

using a hole 36" x 36" x 36" deep.  The top of the concrete foundation 
should be 

 ush with the ground. 

•  Special attention must be paid to the size of 

the conduit and its location within the jig and 
concrete foundation.  The 

Wiring Conduit

can be no more than 1" in diameter.  Use 
reducers if necessary.  Also, make sure that 
the

Wiring Conduit

 is in the center of the 

Anchor Jig

 during installation.

!

Schematic view of 
concrete foundation

Top View

Side View

Reinforcement
Bars

 (12)

Anchor Jig

Wiring Conduit

Wiring conduit

• 

 The 

Wiring Conduit

 must be 1" (see above).  The maximum height of 

the conduit above the foundation is 2", however more height may be 
left during the preparation process.  Simply trim the conduit once the 
concrete foundation has set.

To help reinforce the concrete foundation, place (12) 1/2" diameter x 

32" long 

Reinforcement Bars

 ("rebar") as shown in the diagram.  Use 

suitable preparation methods to place the rebar. 

Suspend the assembled 

Anchor Jig

 in the center of the pad hole.

Leave 2" to 3" of the 

Bolts

 protruding above the pad (unless you're 

using leveling nuts, see previous page).  Make sure that the 

Conduit

is in the center of the 

Anchor Jig

.  Both the jig and the conduit must 

be securely suspended to prevent shifting when the concrete is 
poured.

CALL BEFORE DIGGING!  Be sure that there are no 
underground electric or phone cables, gas or water 
lines in the area where the pole will be located.

!

Prepare the concrete per manufacturer's directions.  The 
concrete must have a compressive strength of 3000 psi, 
and must be fabricated following ACI318-89 requirements. 
Allow the concrete foundation to cure thoroughly before 
proceeding with the installation of the 

P

OL

E

VATOR™

.

Содержание MOOG PV4

Страница 1: ...Jig Installation and Operation Instructions for the following models Before attempting to connect or operate this product please read these instructions completely CERTIFIED 81 IN5222 07 09 2010 2009 Videolarm Inc All Rights Reserved ...

Страница 2: ...l of the following terms and conditions 1 NOTIFICATION OF CLAIMS WARRANTY SERVICE If Purchaser believes that the Product is defective in material or workmanship then written notice with an explanation of the claim shall be given promptly by Purchaser to Videolarm but all claims for warranty service must be made within the warranty period If after investigation Videolarm determines that the reporte...

Страница 3: ...ning Hex Nuts will be used to fasten the pole to the Anchor Jig 4 Before using the Anchor Jig verify that the center to center dimensions between the bolts are even Figure 4 If not adjust accordingly Firmly tighten all Hex Nuts With Leveling Nuts Without Leveling Nuts Figure 1 2 Place the short end of each Bolt into the outside holes of the Cross Strap Place Hex Nuts onto each Bolt and finger tight...

Страница 4: ...reparation process Simply trim the conduit once the concrete foundation has set To help reinforce the concrete foundation place 12 1 2 diameter x 32 long Reinforcement Bars rebar as shown in the diagram Use suitable preparation methods to place the rebar Suspend the assembled Anchor Jig in the center of the pad hole Leave 2 to 3 of the Bolts protruding above the pad unless you re using leveling nu...

Страница 5: ... longevity As part of this procedure we had its Wind Loading capabilities tested Below is the certified result of this test Deflection Curve for PV16 0 01 0 12 0 48 1 08 1 47 1 91 2 42 3 09 4 17 0 00 0 50 1 00 1 50 2 00 2 50 3 00 3 50 4 00 4 50 5 20 40 60 70 80 90 100 110 Wind Speed mph Deflection in ...

Страница 6: ...n Form at www videolarm com productregistration jsp or complete and mail in the bottom portion of this flyer Register your recent Videolarm purchases and benefit from the following Simple and Trouble Free RMA process Added into customer database to receive product updates news Eliminate the need to archive original purchase documents Receipts Purchase Orders etc Main Contact Info First Name Last Nam...

Отзывы: