Part No. XG0512

Rio DX Cast Stove

3.  Install the first stove pipe onto the FST12 / FST14 ellipse sec-

tion (refer to Figure 9). Secure the pipe with at least two ½" hex 
screws spaced  approx. 3/4" from the joint. Slide the remaining 
vertical stove pipes into place, without fastening them.

4.  Cut the horizontal stove pipe (FST11) to length. Slide it and the 

90°elbow and onto the vertical pieces of stove pipe. Slide the 
Decorative Wall Plate (Part # FST07) onto the horizontal section, 
making sure the unpainted side faces the wall.

Completing the Vent Run

5.  Slide the stove back into position so the pipe protrudes through 

the wall. Pull the flex forward and attach it to the termination (or 
other vent sections, if necessary, to extend the vent run) with high 
temp sealant. Run a bead of high temp sealant around the stove 
pipe and push the termination on. Attach the termination to the 
wall as shown on page 5.

  Adjust the position of the stove pipes so thethat joints are all 

equally spaced. Ensure that there is at least 1 1/2" overlap be-
tween each section.

  Secure each stove pipe joint with at least three ½" hex screws 

spaced  approx. 3/4" from the joint (so that the brass ring will 
cover both the joint and the screws).

Finishing

6.  Now slide the Decorative Wall Plate against the hole, level it, and 

secure using four screws.

7.  Cover each joint in the stove pipes with a brass decorator ring. 

The rings should cover the joint as well as the sheet metal screws. 
Attach the ring using the black 3/8" screws provided. Make sure 
the screw is facing the back of the stove. See Figure 11.

Installation

Direct Vent

A) Through-the-Wall (Horizontal) Venting Option

The horizontal venting option requires an FSTK05 Vent Kit. Figure 9 
shows the components which are used to attain different vent heights. 
Additional stove pipe or Montigo Standard Series vent components  
may be used to increase the vent run, as long as the run still falls 
within the limits set out in Figure 8.

1

 

  -  Vertical Rise is measured 

from the center of the stove's 
flue collar to the center of the 
termination.

2

 

  -  A - Std. Stove Pipe (FST11)

 

B - 90° Elbow (MEL10MB)

 

C - Oversize Stove Pipe 

 

      (FST05)

 

D - Standard Termination

 

     (MTO-3)

 

E -  5" stove pipe (F/F)

Figure 11.

 Installing the decorative brass rings.

Installing the Stove Pipe

1.  Ensure that the intended pathway for the venting is clear.Try to 

position the stove midway between two studs to avoid having to 
cut them.  Cut and frame a 10" x 10" hole for the termination. 

2.  First attach the inner pipe to the stove's flue collar using a bead of 

high temp silicone. Attach the outer eliptical section as shown in 
Figure 10. Secure it with four sheet metal screws.

Note: The Eliptical section (FST12 / FST14) is shipped with the stove 

but boxed seperately.

Figure 10. 

Attaching the FST12 Eliptical Section.

Figure 9.

 Possible venting configurations using the FSTK05 kit.

Vertical Rise 29 1/2-

Vertical Rise 43-64"

Vertical Rise 64-79"

Vertical Rise 29 1/2"

Содержание Rio DX

Страница 1: ...place has been turned off Safety screens are available and can reduce the risks of severe burns C US Warning Improperinstallation adjustment alteration serviceormaintenancecancause injury or property damage Refer to this manual For assistance or additional information consult a qualified installer service agency or the gas supplier Warning What to do if you smell gas Do not try to light any applia...

Страница 2: ... this manual Consult your local Gas Inspection Branch on installation require ments for factory built gas fireplaces Installation repairs should be done by a qualified contractor Installations in Canada must conform to the current CAN CGA B 149 1 and 2 Gas Installation Code and local regulations If the optional air circulating fan kit is installed it must be electrically grounded in accordance wit...

Страница 3: ... the stove to a combustible surface is 42 Minimum 1 clearance must be maintained around the vent pipes Figure 2a Minimum clearances to combustible surfaces Top View Clearances The Rio DX Cast Stove s minimum clearances to combustible materials are A Back 3 B Control Side 24 C Right Side 10 D Floor 0 E Top 44 F Corner 2 See diagrams below for explanation Clearance from the top of the stove to a com...

Страница 4: ...also be made for a 1 8 N P T plugged tapping and be accessible for test gauge connection immediately upstream of the gas supply controls to the appliance The stove is supplied with a flexible gas connector which is factory installed The gas valve is located on the back of the stove as indicated in figure 4 It should be attached to the gas line with an approved fitting as required by the applicable...

Страница 5: ...n and the run between each elbow Hx may be any length as long as it does not exceed HT Vent Rise1 Max Max Horiz V of elbows Run HT 29 1 2 min 1 10 4 2 10 5 2 10 10 3 10 15 3 10 20 3 10 25 max See vertical vent section 1 Vertical rise is measured from the center of the stove s flue collar to the center of the termination 2 See Through the Roof Installations Example If V 12 the vent run may use up t...

Страница 6: ... a brass decorator ring The rings should cover the joint as well as the sheet metal screws Attach the ring using the black 3 8 screws provided Make sure the screw is facing the back of the stove See Figure 11 Installation Direct Vent A Through the Wall Horizontal Venting Option The horizontal venting option requires an FSTK05 Vent Kit Figure 9 shows the components which are used to attain differen...

Страница 7: ...ure a minimum of 6 1 4 between the centre of the pathway and the back wall as shown in figure 13a For corner installations measure 24 1 4 between the back corner and the intended pathway as shown in figure 13b This will maintain the stove s minimum clear ances as shown on page 3 Cut and frame an 11 x 11 hole in the ceiling and roof as required Install the ceiling box as shown in Figure 13c Ensure ...

Страница 8: ...ion See Figure 15 Secure each stove pipe joint with at least three hex screws spaced approx 3 4 from the joint so that the brass ring will cover both the joint and the screws Finishing Install the ceiling collar over the ceiling box to provide a finished look Cover each joint in the stove pipes with a brass decorator ring The rings should cover the joint as well as the sheet metal screws Attach th...

Страница 9: ...r optional blower kit 1 Optional Fan Switch Motor Speed Control 15 1 60 Supply G L1 L2 Wiring 2 Place the Back log onto the back log rest as shown in figure 22 The log has a lip on the bottom which fits into the slot on the log rest 3 Place the Front log onto the front log rest as shown in figure 22 Center the log from side to side and push it against the back of the log rest Carefully push the lo...

Страница 10: ... gas control knob slightly and turn clockwise to Off Do not force 1 Turn off remote switch 2 Locate the gas control valve on the back left side of the unit 1 STOP Read the safety information above on this label 2 Locate the gas control valve on the back left side of the unit 3 Push in gas control knob and turn clockwise to OFF 4 Wait five 5 minutes to clear out any gas Smell for gas including near...

Страница 11: ...e glass This is a normal condition and is the result of burning of protective coatings on new metal Glass must be cleaned periodically to remove any film which is a normal biproduct of combustion which may be visible Film can easily be removed by removing the door as shown on page 8 Handle the door carefully and clean it with non abrasive glass cleaners One of the most effective products is Kel Ke...

Страница 12: ...eck wiring diagram figure 28 Main burner will 1 Check wiring see figure 28 not light 2 Check wall switch for proper con nection Gas Control Valve Figure 17 Honeywell VS8520 valve TH On Off Switch Power Generator TP TH TP Turn Gas Supply Off Set thermostat to call for heat SV9500 SV9600 is powered 24VAC nominal HSI Terminals NOTE Before Troubleshooting Familiarize Yourself With The Startup And Chec...

Страница 13: ...nts not manufactured or supplied by The Companies 2 The DelRay Gas Appliance must be subjected to normal use The Gas Appliances are designed to burn gas only Burning conventional fireplace fuels such as wood coal or any other solid fuel will cause damage to the Gas Appliance will produce excessive temperatures and will result in a fire hazard Limitations On Liability It is expressly agreed and und...

Страница 14: ...he United States 6 feet 1 8 m minimum in Canada L clearance to nonmechanical air supply inlet to building or the combus tion air inlet to any other appliance 16 inches 41 cm minimum for appliances 100 000 BTU H 30kW M clearance to mechanical air supply inlet 6 feet 1 8 m minimum N clearance above paved sidewalk or a paved driveway located on public property 7 feet 2 1 m minimum P clearance under v...

Страница 15: ...2 17 Black Stove Pipe 5 lenght std female female 1 18 Black 90o Elbow male male 1 19 Brass Decorator Ring 3 20 Termination 1 21 Self Tapping 1 2 Screws 24 21 Screw Phillips Black 1 per brass ring 3 21 1 1 4 Drywall Screws 4 21 sheet metal screws 8 x 3 8 9 Vent Components Avail Individually Item Quantity Pkg Part Black Stove Pipe 24 std female female 1 FST05 Black Stove Pipe 18 std female female 1 ...

Страница 16: ... Wall Kit Direct Vent Through the Roof Kit 9 5 7 14 06 6 5 10 11 13 12 15 20 16 18 16 22 19 21 17 Notes Spare Parts List Part No NG Gas Valve RGC1021 LP Gas Valve RGC1022 NG Pilot RPA019 LP Pilot RPA019A Front Burner NG RBT1089 Rear Burner LPG RBT1090 RBT1091 RBT1092 Door RDRFS1 Logs RLGS15 Part Description ...

Страница 17: ...line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspection the ...

Страница 18: ...Page 18 Part No XG0512 Rio DX Cast Stove Notes ...

Страница 19: ...Page 19 Part No XG0512 Rio DX Cast Stove Notes ...

Страница 20: ...Canadian Heating Products Inc Langley BC V4W 4A1 Montigo Del Ray Corp Ferndale WA 98248 XG0512 120507 ...

Отзывы: