13
Installation
XG0521 - 180904
Figure 7.
Installing a MTO4F-PV termination.
Figure 7.b
Installing a MTO termination with the MSR frame.
Figure 7.c
Installing a MTO termination with the BSR frame.
1
12”
2”
12”
12”
Installation of termination with built in frame
A termination with a built-in frame is installed during framing of a
structure.
1. Frame the termination opening to 11" x 11".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.
MSR Frame
MTO4-PV (4"/7")
Termination
MTO4F-PV (4"/7")
Termination
Installation of termination frame at time of framing
Terminations with a MSR frame allow the installation of the frame prior
to installation of the termination.
1. Frame the termination opening to 12" x 12".
2. Secure the MSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the MSR Frame using a minimum of 4 screws.
Installation of termination frame at time of framing in masonry
Terminations with a BSR frame allow the installation of the frame in
masonry prior to the installation of the termination
1. Frame the BSR opening to 12" x 12".
2. Secure the BSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the BSR Frame using a minimum of 4 screws.
BSR Frame
11”
11”
Framing
Exterior
Sheathing
Fastening Hard-
ware, minimum
4-screws
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
MTO4-PV (4"/7")
Termination
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
MT04-PV / MT04F-PV Termination