![Montigo EP28-2LB Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/montigo/ep28-2lb/ep28-2lb_installation-and-operation-manual_1830595010.webp)
XG0302C
Page 10
EP8-5 Modular Series Fireplace
9.
Reconnect the primary limit switch as shown in figure 24c. Install
the secondary spill switch in its location on the right side of the
insert, centred in its location as shown in figure 20. Drop the wires
beween the insert and the shell and connect the spill switch to the
thermocouple-gas valve circuit as shown in figure 24c.
6.
Cut the front bar to allow clearance to install the Heating Insert
Using a hacksaw, make the cut approximately 2" in from the side
of the firebox, as shown in figure 16.
7.
Install the new blower assembly included with the S2 Heating
Insert. The blower mounting bracket rests on the EP28 Shell's
support ledges. Push the assembly back until it touches the back
wall of the shell, and drive two screws through the pilot holes in
the bracket. Refer to figure 17. Plug the fan into the fan speed
Figure 16. Cutting the front bar.
Figure 17. Installing the blower assembly.
control box.
8.
Install the efficiency collar as shown in figure 18. Use a long
screwdriver to hold the collar out of the way while you install the
Figure 18. Installing the efficiency collar.
Installation
Heating Insert.
Install the Insert by pushing it all the way back inside the shell as
shown in figure 19. Let the insert rest on the support ledges.
Figure 19. Installing the insert.
Figure 20. Installing the secondary spill switch, also see figure 24c.
WARNING
:
This installation is not complete unless both the primary and sec-
ondary limit switches are wired into the safety circuitry as outlined
in the following instructions and in figure 24c.