Page 6
C34-BV Gas Fireplace
Part No. XG0315
Figure 9c.
Removing the door.
Re-installing the door:
To re-install the door, tilt the top edge towards you and line up the tabs
of the bottom of the door with the slots on the fireplace. Place the tabs
into the slots, and tilt the top of the door back towards the fireplace as
far as it will go. Close the latches by hooking Part B onto the groove at
the top of the door and pushing Part A down completely.
Installation
Once the three latches are unhinged, tilt the top of the door forward
and lift it out of the slots.
See figures 9b and 9c.
Figure 9b.
Removing the door.
Removing and Installing
the Door
Removing the Door:
Remove the trim (as described on the next page) to access the door
latches. Open the latches by pulling Part A upwards and towards you
to disengage Part B from the door. Lift Part B clear of the door.
Repeat for all three latches. Be sure to hold the door carefully so it
does not fall.
(See figure 9a.)
Figure 9a.
Operating the door latches.
Gas Control and Pilot Wiring
C34-BV-I
Honeywell (Q3450)
Pilot Assembly
Pilot Electrical
Harness Connector
Honeywell Gas
Control (SV9501M)
Gas Control
Connector
Fuse
Limit
Switch
Wall
Switch
Fan Plug
Receptacle
Junction Box
Junction Box Cover
White
Black
Green
40 VA
Transformer
115VAC
24VAC
Grnd Screw
Figure 8.
Wiring for the C34 -BV-I with Honeywell gas control and
pilot.
Wiring