© 2011 Monte Carlo Fan Company
2/1/2012
4
Hang assembled fan from the mounting bracket
installed to ceiling in previous step. Make sure
the fan is hanging straight. Rotate fan until the
tab on the Mounting bracket engages the slot on
the Downrod Ball. This must be done to pre-
vent the fan body from rotating when the blades
are in motion.
14
Install the keeper to pin.
11
Tighten the 2 set screws on the yoke
once the downrod is in place.
12
Align the hole in the downrod with
the hole in the yoke. Insert th pin
through the yoke and downrod until
the point appears on the other side.
10
Pull down yoke cover.
13
Fan and light kit combinations over 35 lbs, in
both flush and downrod mode the safety
cable must be installed into the house struc-
ture beams using the 3” lag screws,washers,
and lock washers. provided. Make sure that
when the safety cable is fully extended the
lead wires are longer than the cable and no
stress is placed on the lead wires.
15
Safety cable installation
Safety Cable
Lag Screw
safety
cable
3” lag
screw
lock
washer
washer
Set dip switches on the Remote Transmitter and Re-
mote Receiver to the same settings. This must be
done so the units will communicate properly. If you
have other fans you can set to control from one
transmitter by setting both receivers the same as the
transmitter. If you have more than one fan with re-
mote. You can set the dip switches to different posi-
tions to have seperate control.
17
Remote Transmit-
ter Dip switches
Remote Receiver Dip
switches
Install remote receiver by sliding into opening
in the Mounting bracket. Make sure that the
dip switches on the Transmitter and the Re-
ceiver are set to the same position.
18
Make sure the studs protruding from the
bottom of the Mounting bracket are in-
stalled with threads all the way through
the bracket.
16
Содержание 5SLR52 Series
Страница 9: ...Feb 2012 New format ...