background image

Tighten yoke set screws securely and evenly.

Loosen the 2 set screws in the yoke. Insert

downrod into yoke, aligning hole large hole in

the downrod with the large hole in the yoke.

Insert cross pin though yoke and downrod.

Insert cotter pin in to cross pin to secure.

Install yoke cover to downrod.

Install canopy to downrod.

9

10

15

12

13

Thread leadwire and safety cable through

downrod.

11

14

For Canadian installation and for USA fan and

light kit combinations over 35 lbs, in both flush

and downrod mode the safety cable must be

installed into the house structure beams using

the 3” lag screws provided.  Make sure that

when the safety cable is fully extended the

leadwires are longer than the cable and no

stress is placed on the leadwires.

17

Safety cable installation

Safety Cable

Lag Screw

Make wire connections to power source using

wire nuts provided.  Make sure that no filiments

are outside of the wirenut. After making the

wire connections, the wires should be spread

apart with the grounded conductor and the

equipment-grounding conductor on one side of

the outlet box and ungrounded conductor on

the other side of the outlet box.

18

Hang assembled fan from the mounting bracket

installed to ceiling in previous step.  Make sure

the fan is hanging straight.  Rotate fan until the

tab on the Mounting bracket engages the slot

on the Downrod Ball.  This must be done to

prevent the fan body from rotating when the

blades are in motion.

Re-install safety bar removed in step. 3 by

placing safety bar on screws, sliding into place,

and tightening the 2 screws.

16

Lift mounting neck to mounting Plate and align

screws. 

7

Secure mounting neck to the mounting plate

with four screws to become a complete mount-

ing bracket.

8

Содержание 5GL52 Series

Страница 1: ...Quality Ceiling fans Owner s Manual Ceiling Fan Installation Instructions For 5GL52 Series Fans READ AND SAVE THESE INSTRUCTIONS Total fan weight ...

Страница 2: ...b or shower The combustion airflow needed for safe operation of fuel burning equipment may be affected by this unit s operation Follow the heating equip ment manufacturer s guideline safety standards such as those published by the National Fire Protection Association NFPA and the American Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities Before ...

Страница 3: ...nstallation Safety Cable Lag Screw Make wire connections to power source using wire nuts provided Make sure that no filiments are outside of the wirenut After making the wire connections the wires should be spread apart with the grounded conductor and the equipment grounding conductor on one side of the outlet box and ungrounded conductor on the other side of the outlet box 18 Hang assembled fan f...

Страница 4: ...res from house may vary in color and may not include ground wire After wiring is complete gently push wires into junction box with wire nuts pointing upward Refer to point 3 of safety tips 20 House Fan Black White Green Black White Green downrod Green Bracket Blue For control of fan and optional light from wall location follow diagram above NOTE A profes sional electrician is recommended for this ...

Страница 5: ...evels by the following procedure To adjust a blade tip down insert a washer not supplied between the blade and blade holder at the screw closest to the motor To adjust a blade tip up insert washer not supplied between the blade and blade holder at the two screws farthest from the motor Reverse the position of the washer if blades mount from top of blade 6 If blade wobble is still noticeable interc...

Отзывы: