Installation Instructions
5
STEP 1 MOVE REFRIGERATOR
INDOORS
IMPORTANT:
Door and passageways into
the installation location require a 36" min. opening. If
the opening is less than 36", the top cap and doors must
be removed.
NOTE:
Skip this step if door removal is not required.
See instructions on next page, “To Move The
Refrigerator Indoors."
REMOVE THE DOORS
The top cap must be removed to access hinges. It is best
to remove one door at a time.
A.
Remove two screws on top of the refrigerator, one on
each side.
Push the top cap forward and lift up from the rear.
B.
Remove 2 screws holding the top filler strip, lift off.
C.
Open both doors. Remove the 2 toekick screws and
pull forward to remove.
D.
Disconnect the water line coupler by pushing against
the collar on the left side. Disconnect wire harness.
E.
Remove 2 screws holding top hinge to the case.
Carefully, lift off door.
Follow the same procedure to remove the fresh food
door.
Water Line Coupler
A
B
Hinge Screws
Wire Harness
Toekick Screw
E
D
C
To prevent damage, leave inside
packaging, door spacer and outside
protective wrap in place until the unit
is moved to the installation location.
Содержание ZFSB26D SS
Страница 10: ...Notes 10...
Страница 11: ...Notes 11...