Issue 03 – June 2018
55
Setting the fan speed
Once the room is room is complete, you will need to set the fan speed of the unit.
To perform accurately this requires the use of a calibrated Ø100mm rotating vane anemometer.
Turn the system on and set the fan speed to the required level on each CAM using a vane
anemometer to measure the air velocity from the HEPA filter.
The air volume required to achieve N air changes per hour can be calculated by the following
formula:
Air volume required (m³/hour) = Room Volume (m³) X N
The air volume of each CAM can be calculated by the following formula:
Air Volume (m³/hour) = 3000 X measured HEPA velocity (m/sec.)
The following table gives an indication of air volume (m³/hour) against HEPA velocity:
HEPA Velocity (m/sec.)
Air Volume (m³/hour)
0.30
900
0.35
1050
0.40
1200
0.45
1350
0.50
1500
0.55
1650
0.60
1800
0.65
1950
0.70
2100
0.75
2250
As a rough guide when an anemometer is not available (and when pre-filters are new), you can use
the ‘Fan Speed’ knob to set the speed as follows:
Fan Speed Position
Air Volume (m³/hour)
1
225
2
450
3
675
4
900
5
1125
6
1350
7
1575
8
1800
9
2025
10
2250
Содержание Cleanroom Kit 4M
Страница 1: ...Issue 03 June 2018 1 Cleanroom Kits ...
Страница 2: ...Issue 03 June 2018 2 Installation Guide ...
Страница 3: ...Issue 03 June 2018 3 ...
Страница 24: ...Issue 03 June 2018 24 Standard Wall Panel ...
Страница 25: ...Issue 03 June 2018 25 Door Panels ...
Страница 26: ...Issue 03 June 2018 26 Door Door is supplied fully assembled however for reference exploded view below ...
Страница 27: ...Issue 03 June 2018 27 Ceiling Assembly 4M 2m x 2m room ...
Страница 28: ...Issue 03 June 2018 28 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 29: ...Issue 03 June 2018 29 6M 3m x 2m room ...
Страница 30: ...Issue 03 June 2018 30 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 35: ...Issue 03 June 2018 35 Using CAM1000 in 9M 9M 12M 12M ...
Страница 36: ...Issue 03 June 2018 36 Top Door Runner Assembly ...
Страница 40: ...Issue 03 June 2018 40 5 ...
Страница 58: ...Issue 03 June 2018 58 6M 3m x 2m room ...
Страница 59: ...Issue 03 June 2018 59 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 60: ...Issue 03 June 2018 60 9M 3m x 3m room ...
Страница 61: ...Issue 03 June 2018 61 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 62: ...Issue 03 June 2018 62 12M 4m x 3m room ...
Страница 63: ...Issue 03 June 2018 63 12Mplus 4m x 3m room with 1m x 3m atrium ...
Страница 64: ...Issue 03 June 2018 64 Complete Cleanroom Layouts 4M 2m x 2m room 4Mplus 2m x 2m room with 1m x 2m atrium ...
Страница 65: ...Issue 03 June 2018 65 6M 3m x 2m room ...
Страница 66: ...Issue 03 June 2018 66 6Mplus 3m x 2m room with 1m x 2m atrium ...
Страница 67: ...Issue 03 June 2018 67 9M 3m x 3m room ...
Страница 68: ...Issue 03 June 2018 68 9Mplus 3m x 3m room with 1m x 3m atrium ...
Страница 69: ...Issue 03 June 2018 69 12M 4m x 3m room ...
Страница 70: ...Issue 03 June 2018 70 12Mplus 4m x 3m room with 1m x 3m atrium ...