Section 2
Installation
General
The cabinet may be delivered fully assembled or part assembled for final assembly on
site by trained engineers who will ensure it is ready for use.
The following guidelines should be observed when installing and first using the
cabinet:
Site the cabinet in a draught free position.
Connect the cabinet to a 13A socket.
Switch the cabinet on.
The red low airflow warning light will flash until the airflow has reached its correct
velocity and stabilised.
When the green ‘SAFE AIRFLOW’ light is illuminated the cabinet is ready for use
Testing / Commissioning
A test certificate will be supplied for conformity to CE marking, and electrical test.
The airflow should be checked using a vane anemometer and the results recorded.
The main HEPA filter will have been factory tested before delivery.
A DOP filter challenge test should be carried out to verify filter integrity when the
cabinet is installed.
THE CABINET SHOULD BE TESTED AT LEAST EVERY 12 MONTHS.