34
56D2161
BRICK INSTALLATION
FLOOR BRICK INSTALLATION
SDV500C (1-PIECE)
Install floor brick before installing logs or rock wool.
1. Remove floor brick from packaging.
2. Match two (2) firebox tabs with two (2) slots on
bottom of brick.
See Figure 45.
3. Push brick down until it makes contact with bottom
of firebox.
Note: Remove floor brick to install brick walls.
Remove floor brick for cleaning.
Figure 45 - Installing Floor Brick - SDV500C
Firebox Tabs
Slots
Floor Brick
Figure 46 - Installing Floor Brick - SDV600C
FLOOR BRICK INSTALLATION
SDV600C (4-PIECE)
Install floor brick before installing logs or rock wool.
1. Locate two (2) rear floor bricks (left and right) in
spaces between log supports and side walls.
See
Figure 46.
2. Join two (2) front bricks together as shown. Rest two
(2) joined front bricks on front of burner. Make sure
firebox tabs are inserted in slots located on the bottom
of front bricks.
See Figures 45 and 46.
Note: Remove floor brick to install brick walls.
Remove floor brick for cleaning.
Rear Bricks
Slot
Slot
Front Bricks
Log Supports
Содержание SDV Series
Страница 46: ...46 56D2161 1 5 10 3 2 4 6A 6B 9 8 13 7 12 11 11 ILLUSTRATED PARTS LISTS FIREBOX COMPONENTS ...
Страница 48: ...48 56D2161 ILLUSTRATED PARTS LISTS ADDITIONAL ACCESSORIES 1 2 3 4 5 ...
Страница 52: ...52 56D2161 1 2 3 4 5 6 7 L O HI ILLUSTRATED PARTS LISTS 1 2 3 4 5 6 7 9 ELECTRONIC IGNITION 8 10 11 ...
Страница 58: ...58 56D2161 NOTES ...
Страница 59: ...56D2161 59 NOTES ...