FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following
Figures 9
through 12
and the chart below for your specific installation requirements.
See Figure 1 on Page 6
for firebox dimensions.
The framing headers may rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be
installed on a metal or wood panel extending the full width and depth of the enclosure.
GCUF32 GCUF36 GCUF42
A 37
1
/
4
" 41
1
/
4
" 47
1
/
4
"
B 37
3
/
4
" 37
3
/
4
" 37
3
/
4
"
C 28
3
/
4
" 30
1
/
2
" 36
1
/
2
"
D 14
3
/
4
" 15
1
/
4
" 18
1
/
4
"
E 60 3/4 71
1
/
2
" 77
1
/
2
"
F 30
3
/
8
" 35
3
/
4
" 38
3
/
4
"
G 16 21 21
H 43" 50
1
/
2
" 55"
Figure 9 - Corner Installation
Figure 11 - Stud Location
Figure 10 - Inside Chase
Installation
Figure 12 - Recessed
Installation
Do not fill spaces around firebox with
insulation or other materials. This
could cause a fire.
W
ARNING