Hand Crimp Tool for Commoning Crimp Terminals
Doc No: ATS-638250500
Release Date: 02-14-11
UNCONTROLLED COPY
Page 4 of 7
Revision: A
Revision Date: 02-14-11
Figure 8
PUSH ON
HANDLE
JAWS OPEN
PULL OPEN
TOOLING
TOOLING
M3 BHCS
SQUEEZE
HERE
LOCATOR
Figure 7A
SQUEEZE
HERE
TOP HOOKS
TOP SLOTS OF
HANDTOOL
LOWER TABS
MAKE SURE
CENTER OF LOCATOR
IS IN THE
DOWN POSITION
Figure 7B
Note:
A crimp height chart is provided with this manual as Reference Only. Due to the wide range of wires, strands,
insulation diameters, and durometers available, actual crimp height measurements may very slightly. An
occasional, destructive, pull force test should be preformed to check hand tool crimp. Pull Force value Must exceed
the Minimum pull force specifications listed.
Locator Installation
See the parts list on the last page of this document for the proper locator order number. Follow the steps below to
replace the locator.
1.
Open the crimp hand tool.
2.
Squeeze gently on the lower area shown in Figure 7A with your thumb and index finger. The lower tabs of the
locator should disengage from the hand tool.
3.
Lift and pull away from the hand tool. The top
locator hooks should slip out of the top slots easily.
See Figure 7A.
4.
To reinstall the new locator, make sure the hand
tool is in the open position.
5.
Press the red insert down as far as it will go as
shown in Figure 7B.
6.
Holding onto the lower part of the locator with your
thumb and index finger, insert the locator top hooks
(2) into the hand tool top slots.
7.
Rotate the locator down and press the lower tabs into the two bottom slots of the hand tool. To secure the
locator into place, the lower tabs must snap into place on the hand tool frame.
MATCH
UP MARKS
FRONT
BACK
Figure 9