3.15 EM1 / EM2 / EM3 Lift Connections
NOTE
Review the information in “3.13 E-Multi Weight Specifications” on page
3-20 before performing any lifting procedure.
3.15.1 EM1 / EM2 / EM3 Vertical Lift Connections
Table 3-11 EM1 / EM2 / EM3 Vertical Lift Connections
EM1 / EM2
EM3
Connect sling to motor end of the
support beam using one 16 mm
(5/8 in.) shackle in lifting hole.
Connect sling to motor end
of the support beam using a
25 mm (1 in.) shackle in lifting
hole.
Figure 3-6 EM1 / EM2 vertical lifting connections (EM3 similar)
3-22
E-Multi User Manual
SAFETY
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.