Check designated area for floor level irregularities.
• Lay out skid plates (e.g. 100mm x 1000mm x 1mm approx metal sheet strips )
on the floor roughly where the counter module feet will land & place unit on top.
• To eliminate the additional feet snagging on the floor when positioning, temporarily run up the
adjustable feet that are not on the skid plates.
This allows the unit to slide on the feet in contact with the plates
• Whenever possible start at the high end of the floor & position the first unit in its chosen location.
• Check the module unit height from floor to work top, adjust legs and set level.
(Making sure the skid plates are central to the units legs)