3
Align and tighten the nut
(C)
to the end of the install gasket .
Check that hot & cold supply hoses are connected correctly to hot
& cold supplies.
将螺母
(C)
对准安装杆拧紧至安装垫片底部。
将水龙头冷热水管分别正确地连接到冷热进水口。
1
1
3
3
2
2
4
4
Place the water pipe at the bottom of the tap from the hole in the
sink as shown in the figure.
Align the hole of the install gasket
(B)
to the to the mounting stud
in the direction as shown in the figure
and secure it to the bottom
of the tap.
将水龙头下端的进水管如图所示从水槽的孔洞放入。
将安装垫片
(B)
上的孔洞对准安装杆,方向如图所示,固定在水
龙头的底部。
热
热
Hot
Hot
冷
冷
Cold
Cold
B
C