Please read this installation carefully before installation to
prepare and familiarize yourself with the required installation
tools, materials, installation steps and precautions, avoid
unnecessary losses due to improper installation.
Confirm that the bathroom wall and floor tiles have been
completed, and the sewage pipe and water supply pipe have been
reserved. If you are replacing the old urinal with a new one,
please pay attention to the status of the existing sewage pipe and
water supply pipe. If necessary, replace them in time.
Before replacing the urinal with a new one, turn off the water
supply first.
Reserve the positions of the sewage pipe and water supply
pipe, please refer to the corresponding product size, and confirm
that the pre-installed sewage pipe and water supply pipe size
meet the installation requirements.
For your personal and property safety, before using the
percussion drill to make holes, please make sure that there is
no pipeline or cable buried in the wall that’s need to be punched.
Please use it in an environment above 0
℃
. In an environment
below 0°
℃
, the product cannot store water i n t h e d r a i n t r a p ,
the expansion of water freezing may damage the product.
Please do not pour paper towels or cigarette butts into the
urinal.
Please do not use hard materials (like scouring pad) to clean
product surface, especially the product logo.
If the water in the place where you live is hard, keep the flush
hole clean to ensure that the toilet flushes normally. Use toilet
cleaner to clean at least once a week. Use a brush with a long
handle to clean the flushing hole, and extend it into the drain
pipe as much as possible to prevent mineral accumulation.
Wall drainage installation steps:
Ground drainage installation steps:
2
Checklist before Installation
Installation steps
C
C
1A-2A-3-4-5-6-7A
1B-2B-3-4-5-7B
注:本说明书标注的产品示意图仅供参考,请以实物为准。
Note: The product schematics marked in this manual are for
reference only, please refer to the actual product.