3. Inspection of thermal and moisture sensors if provided:

Identify control cables. Mody Pumps provides a reference such as color-coded labels

or sticker on the cable.

a. Probe Sensor.  Normally open

Using  a  multimeter  and  setting  it  on  the  Ohm  resistance  mode,  connect  meter

terminals to wires (Probe) and Green (Ground) and check for ohm resistance. An

open-connection  reading  must  be  obtained,  otherwise  pump  has  a  wet  stator  or

water in the oil chamber which may require further inspection of the complete pump

unit.

b. Thermal sensor: Normally closed

Using  a  multimeter  set  the  instrument  on  ohm-resistance  mode  and  connect

terminals to wires Thermal 1 and Thermal 2. These terminals represent the thermal

switches embedded in all three windings connected internally in series and should

show continuity indicating a normally closed circuit. In the event there is no reading

indicating an open circuit the stator will have to be removed for further evaluation.

All pumps and control panels must be properly grounded. 

4. Installation:

a. Ensure site voltage

 corresponds with voltage value stamped on pump nameplate.

b. Check for pump rotation before installation

. Improper rotation may result in poor

pump performance and can damage the pump motor. Pumps are provided with tags

that show the rotation of the impeller and the Kick start. The kick start, thus rotation

can be checked by energizing the pump for a short period of time. If the “kick” is not

noticeable suspend pump freely and energize it momentarily. Shift any two phases

in the power supply if the kick is wrong.

Do not operate Pump in reverse rotation - severe damage may result.

c. Lifting:

Do not lift or pull the pump under any circumstances by means of the power cable.

Always lift pump by securely fitted lifting hooks/eyebolts provided with pump.

Содержание MSVSS

Страница 1: ...ONS INSTALLATION MAINTENANCE MANUAL INCLUDING SPARE PARTS LIST Mody Pumps Inc 2166 Zeus Court Bakersfield CA 93308 Tel 661 392 7600 FAX 661 392 7601 EMAIL sales modypump com http www modypump com with...

Страница 2: ...harge hose as it may whip or burst catastrophically under pressure Pumps build up heat and pressure during operation Allow time for pumps to cool before handling or servicing Do not pump flammable or...

Страница 3: ...onsists of double silicon carbide silicon carbide and carbon ceramic mechanical seals immersed in an oil bath combined with an external oil seal The complete package is a pressure compensated sealing...

Страница 4: ...ax fluid temperature 104F 40C POWER SUPPLY AC 1 phase 60 Hz 120V 240V and 3 phase 240 480V STARTING METHOD Plug in Float DOL OUTLET DISCHARGE 2 3 4 NPT Flange PUMP ROTOR SHAFT Rugged aluminum die cast...

Страница 5: ...nsulation Resistance Test Set the Megohmmeter on the insulation mode Connect a power lead on the positive side of the meter probe Connect negative meter probe to ground and press the test button The r...

Страница 6: ...indicating a normally closed circuit In the event there is no reading indicating an open circuit the stator will have to be removed for further evaluation All pumps and control panels must be properl...

Страница 7: ...pump is in overloading conditions If a generator is the power source check for voltage variation periodically Motors are designed to operate on single voltage and frequency Max Deviation in voltage al...

Страница 8: ...ure does not hold the leak must be located and fixed Cleaning the seal faces and reinstalling the seals may fix the problem Handle seals with extreme care Keep seal faces clean Do not scratch seal fac...

Страница 9: ...uthorized Mody Pumps Service Center check with your Local Mody Representative in your Country or State Province or contact Mody Pumps Inc We are located at 2166 Zeus Court Bakersfield CA 93308 USA Tel...

Страница 10: ...TROUBLESHOOTING...

Страница 11: ...SPECIFICATIONS AND DIMENSIONS MSVSS05 1...

Страница 12: ...MSVSS1 1...

Страница 13: ...MSVSS2 1...

Страница 14: ...MSVSS2 3...

Страница 15: ...MSVSS3 3...

Страница 16: ...MSVSS3 5...

Страница 17: ...MSVSS4 7 5...

Страница 18: ...MSVSS4 10...

Страница 19: ...TUS2 MSVSS0 5 1 TUS2 MSVSS1 1...

Страница 20: ...TUS2 MSVSS2 1 TUS2 MSVSS2 3...

Страница 21: ...TUS3 MSVSS3 3 TUS3 MSVSS3 5...

Страница 22: ...TUS4 MSVSS4 7 5 TUS4 MSVSS4 10...

Страница 23: ...TUS2 3 Upper Guide Rail Bracket TUS4 Upper Guide Rail Bracket...

Страница 24: ...MSVSS0 5 1...

Страница 25: ...Screw M5x12 316 Float Swich 15A 250V 46cm Handle 140mm 316 Brace Screw 1 4x150 316 Screw M6x20 316 Cable 16AWGx3Cx15 UL CSA Upper Cover 123mm P 1 2 1HP 316 O Ring 111x2 Screw M5x8 Ground Wire Copper...

Страница 26: ...MSVSS1 1...

Страница 27: ...x3 Screw M6x35 316 Washer M6 1 4 316 Motor Bracket 1 2 1HP 316 Bracket 123mm T Snap Bushing OSB 26 Motor Casing 123x155 16 316 Stator 60Hz 110V Bearing 6202 2RS Rotor Set 123 61 65 316 Bearing 6303 2R...

Страница 28: ...MSVSS2 1...

Страница 29: ...54 67 67 J 3 0 2 E467 6 0 00 0 02 0 0 1 E 36 37N6 5G 01 2 I J 3 0 M 537 C63 0A 2A1 MC6 3 78 45G OP 66 7H Q 11 OP 66 A 0 2 R 3 2 1 C33CP7 6 3 1 MSVSS2 1 1 2 0 L S T0 L U V WT0 T0 Z 2 PPT0 V S 2T0 V S0V...

Страница 30: ...MSVSS2 3...

Страница 31: ...I 6 6 H 1 Q TT B BK K 6 U89U I6 0123 9 9 N 9 I6 0123 U U D9 6 6 9 H 1 Q 9TT 9 9 O PMB Q D 6 8 0123 495 7 B 8 K K H 1 V M E I 56 W 9 O 31 1 1 XY9 M M4 Z 5OZWP 7 9 N 9 M 8 N 0123 9 9 I O P 1 6 B 6 8 31...

Страница 32: ...MSVSS3 3...

Страница 33: ...4 4 2345 6 7 W3KE GA9 34 BKDD43 4 K A 4 AIK 3G HH 6K K3AB U F 7 A8 K3 1XA J I4 3 U K K3A 4 Y Y O O 1 9 43 R Y S 2345 6 7 I4 3 UAZ 74GA 424 Y Y F I4 3 U TO U 7 F 2345 6 7 8 9 43 6 R J S8 6K K3AI3 2 4 H...

Страница 34: ...MSVSS3 5...

Страница 35: ...AEF43 6 G H I8 6 3 3A2U4 B B V 1 8 4A3OLP MO74Y O424 Z Z 4A3OLP RB OLP 7 3 4 Z Z B B 1 DAEF43 G Z I 2345 6 7 RB OLP 7 4A3OLP 3 42 O L OLP W FQ 4L4 3 KQ 4L4 2345 6 7 3 LY DO34 N KK43 F4L 4EOL A3Y 6 3 N...

Страница 36: ...MSVSS4 7 5...

Страница 37: ...ZA 3B 42 B A Z Y 4 4A 3BN 4 4 2345 6 7 3BE RA9 34 FBNN43 4 B A 4 AUB 3R SS 6B B3AF Z O 7 8 B3 1 A K 0 U4 3 Z B B3A 4 O 1 A8 9 43 P Q 2345 6 7 U4 3 ZAH 74RA 424 O U4 3 Z M A 4 7 O 6B B3AU3 2C4 SST T O...

Страница 38: ...MSVSS4 10...

Страница 39: ...n Ring A BCDE EF G HCDE E Screw 2 3 Ground Wire HHEG Phenol Resin Board 99 Motor Casing 6 3 4 Stator 1IF 5 0FF J J Bearing Rotor Set J J 1 F4 Washer 7 J 8 Screw 2 3 Bearing Fixed Piece J J 6 Bearing O...

Страница 40: ...duct was used in a manner inconsistent with normal industry practice and or our recommendations or instructions The Customer is responsible for communicating all vital information about the applicatio...

Отзывы: