1.5. Equipment
The boiler is being delivered in completed state. Its basic equipment
include: a thermometer, a G½(G¾) drain valve, a G¾(G1)safety valve, complete
cleaning set, a drawer, cast-iron grate (only in AZSB30).
The feeder is provided partially assembled. Some parts of the feeder, after
workshop tests are disassembled and packed inside the container. This is meant
to facilitate transport and device handling to the boiler room. The feeder is
equipped with all necessary elements permitting its installation outside the
electric installation.
2. Assembly
2.1. General parameters
Maximum supply temperature – 80˚C
Maximum return temperature – 70˚C
Minimum recommended return temperature – 55˚C
Operating pressure - 1.5 bar (for versions above 50kW – 2.5 bar)
Thermal efficiency 84%
Combustion gases minimum temperature – 150ºC
2.2. Boiler Room
The boiler room shall meet requirements of the PN-87/B-02411 standard.
Here are some of the most important of them:
•
waterproof flooring
•
steel or wooden doors lined with sheet metal, opening outwards
•
21x21 cm air supply hole in the bottom part of the boiler room
•
at least 14x14 cm exhaust hole in the upper part of the boiler room
Equipment:
•
tap
•
sewage well
•
sink
Forced ventilation must not be used.
2.2.1. Boiler Installation
Boiler installation shall be performed by installer with appropriate
qualifications and experience (we advice to seek help from representative
centres, whose installers have undergone training in Moderator Sp. z o.o.). A