Modentic Y-Type Скачать руководство пользователя страница 4

 

 

5. 

Threaded Ends 

a.  Check specification of threads on mating pipe. 

b.  Apply joint compound to the male end of joint only. 

c.  Use suitable sealing material. 

d.  Use wrench and apply force on the hexagon end of the valve only. Apply force to 

other area of valve may seriously damage the valve. 

e.  Following installation, carry out leak and operating tests. 

6.  Install the Strainer in such a way that extensive stresses in any direction on the Strainer 

are avoided. 

7.  Y-Strainers have no provision to accept gauges. Pressure gauges near the Strainer inlet 

& outlet are required to determine differential pressure across the Strainer and cleaning 
frequency.  

8.  Pressure gauges are essential for the safe operation of the Strainer and should be 

installed using standard piping practices. 

9.  Always do leak test to the system before using. 

 

 

Maintenance 

1. 

Removal of screen: 

a.  Check the piping system is completely depressurize and drained. 

b.  Remove the drain plug on the end cap. 

c.  Disassemble the coupling and end cap. Be prepared to support the screen when 

removing the gasket and end cap. 

d.  Rinse the screen to remove any debris that has accumulated. 

2. 

Screen installation: 

a.  Align the angled end of the screen for proper insertion into the strainer body. 

b.  Insert the screen into the strainer body. 

c.  Install the end cap and the coupling. 

 

User’s note: 

1. 

End-users have the responsibility to check the wall thickness in regular intervals due to 
wear/ tear/ corrosion of the fluid in order to ensure the wall thickness is not below the 
minimum safety thickness allowed in the standard. 

2. 

The most important thing is to keep off the injury to the personal and the damage to the 
equipment. 

Содержание Y-Type

Страница 1: ...uld be installed at place where space for periodic inspection and maintenance is sufficient 5 Do not store or install the strainer near any heat source or hot surface The strainer may cause deformation destruction and fire 6 Avoid excessive force on the strainer when plumbed in 7 Essential safety working regulations are to be strictly kept 8 Do not disassembly when bearing pressure Strainer is not...

Страница 2: ... All the marking information should be cast on the body or on a metal plate which is spot welded to the body PED VALVES MARKING MARK DESCRIPTION A TYPE NO B YEAR OF MANUFACTURE C MATERIAL D SIZE E PRESSURE F CE MARK G TEMPERATURE H TUV RHEINLAND BERLIN BRANDENBURG HEAT NO CAST ON THE BODY AND CAP MD LOGO CAST ON THE BODY OR ON THE NAMEPLATE X XXX XXX CF8M DN32 A PN40 XXXXXXXX 0038 B C E D F H G PE...

Страница 3: ...are free from dirt and burrs And it might be necessary to flush the strainer and the pipes to remove the accumulated dirt and burrs 3 Always depressurize and drain the piping system before installation 4 Flanged Ends a Check companion of flanges are dimensionally compatible with the flanges on the valve body and make sure sealing surfaces are free of grease dirt etc b Prepare the suitable gasket f...

Страница 4: ...stalled using standard piping practices 9 Always do leak test to the system before using Maintenance 1 Removal of screen a Check the piping system is completely depressurize and drained b Remove the drain plug on the end cap c Disassemble the coupling and end cap Be prepared to support the screen when removing the gasket and end cap d Rinse the screen to remove any debris that has accumulated 2 Sc...

Отзывы: