background image

Instruction notice (EN) 

 

20 

NOT-MC89-EN-2019-v01 

 

 

9.  Maintenance and Servicing 

 

Take the machine to a registered 

modec

 distributor for servicing every 400 hours or at least once a month. 

Maintenance operation 

Weekly 

Yearly or as needed 

Check and service the actuator by a registered 

modec

 distributor 

 

 

Replace the Revolution counter battery * 

 

 

Check the torque limiter* by a registered 

modec

 distributor 

 

 

*The revolution counter is an option 

Maintenance to be carried out at the indicated intervals in months or in hours of 
use, from the first deadline onwards. 

Interval 

After each 

time used 

Every 3 months 

or 25 hours 

Every 6 months 

or 50 hours 

Every year or 

100 hours 

Range 

Parts 

Task 

MC89 

Condition of the tool and protective elements 

Check 

 

 

 

MC89 

Functioning of the triggers and Stop/ Start button 

Check 

 

 

 

MC89 

Functioning of the setting systems for the torque, 
speed and direction inversion 

Check 

 

 

 

MC89 

Condition of the cables and/or leads 

Check 

 

 

 

U : user – M : 

modec

 

registered distributor / repairer

 

General recommendations 

 

Take note of all the work health and safety regulatory provisions that apply and any local workplace safety instructions including 
conditions relating to the work environment, clothing and the operator’s individual protective equipment as required by all the 
applicable regulations. 

 

It is advisable to keep a maintenance log for all maintenance tasks carried out on the actuator.  

 

Prevent foreign bodies from entering the system by using a clean work surface in order to protect the delicate moving parts from 
being contaminated by dirt or foreign materials when assembling and dissembling, as this could cause a deterioration of the 
mechanical parts. 

 

Maintenance of the Portable Valve Actuators should be carried out by people who have been trained by 

modec

.  

Our “After Sales Service” department are ready to help in this respect.  

 

Systematically  disconnect  the actuator  from  the  power  feed  (battery  pack  or  mains)  before  carrying  out  any  procedure  that 
involves replacing, adjusting, servicing or dissembling the actuator or any of its parts.  

 

Every time maintenance is carried out, test the actuator afterwards to check it is working correctly. 

 

Only use approved replacement parts and follow the manufacturer’s advice with regard to lubrication and water-proofing. 

 

Содержание MC89E Series

Страница 1: ...offers the highest torque 900 Nm This makes it the perfect tool for any valve type indoor or outdoor with a great autonomy Its two 18V Lithium Ion batteries allow to use it continuously during up to o...

Страница 2: ...le Valve Actuator 11 a Changing the battery pack 11 b Settings 11 6 Setting up the Portable Valve Actuator 15 a General info 15 b Fixing the actuator on to the torque management device and or on an ad...

Страница 3: ...notice Updates will be available on our website www modec fr It is important to refer to the website before setting up or using the actuator and before carrying out maintenance Any modifications made...

Страница 4: ...igatory to tie back hair and to wear close fitting clothes not floaty to ensure all clothing parts are distanced when moving To avoid the motor starting at the wrong time before picking up or while ca...

Страница 5: ...rt of dangerous materials The operator can transport the batteries by road without taking any additional measures When transporting via a third party for example by air or a via a transport company yo...

Страница 6: ...XXXXXX Petrol gas PY68E xxx xx Gas Portable Actuator Easy Duty PY68E XXXXXXXX PY68S xxx xx Gas Portable Actuator Standard Duty PY68S XXXXXXXX PY68H xxx xx Gas Portable Actuator Heavy Duty PY68H XXXXXX...

Страница 7: ...incumbent on the company using the equipment to ensure that safety rules are respected Hearing protection Protective goggles Safety shoes Safety gloves level 3121 according to EN388 Safety signs Summa...

Страница 8: ...ising stem They also add a gear ratio to the system by reducing the speed and increasing the torque by 4 for the BJH01 and by 3 for the BJH02 However the BJH01 cannot withstand an output torque higher...

Страница 9: ...4 dB A Uncertainty of measure K 3 dB Values established from an equivalent apparatus Value of vibration emission Ah 2 5 m s Uncertainty of measure K 1 5m s Values established from an equivalent appara...

Страница 10: ...charger BAT145 45 minutes 53 minutes Charging time with quick charger BAT146 33 minutes 40 minutes Weight 0 7 kg 0 7 kg Autonomy is measured with a load equal to 50 of the max torque Instructions for...

Страница 11: ...ndicates a general fault e g incomplete contact short circuit battery pack faulty etc b Settings Risk of injury Only adjust the settings when the power tool is switched off and free of any load CHANGI...

Страница 12: ...9 65 87 117 152 196 245 299 365 V tr min 10 11 12 13 14 15 16 17 17 18 19 20 Cmax Nm 35 38 41 52 68 90 120 152 193 239 291 348 V tr min 10 11 12 13 14 15 16 17 17 18 19 20 Cmax Nm 16 19 24 33 44 60 79...

Страница 13: ...905 1113 1350 V tr min 2 6 2 9 3 2 3 5 3 8 4 0 4 3 4 5 4 7 4 9 5 1 5 3 Cmax Nm 131 148 148 193 252 326 445 564 712 890 1083 1291 V tr min 2 6 2 9 3 2 3 5 3 8 4 0 4 3 4 5 4 7 4 9 5 1 5 3 Cmax Nm 61 71...

Страница 14: ...1 9 2 0 2 2 2 3 2 4 2 5 2 6 2 7 Cmax Nm 258 280 300 381 498 660 880 1120 1420 1760 2140 2560 V tr min 1 3 1 5 1 6 1 8 1 9 2 0 2 2 2 3 2 4 2 5 2 6 2 7 Cmax Nm 120 141 179 240 320 440 580 760 960 1180...

Страница 15: ...que management reaction bar A strap or a chain 2 carabiners In addition to this basic pack modec also has a wide range of torque management accessories see the catalogue and the following presentation...

Страница 16: ...urn with the fixation springs rings and release the springs making sure they come back Check that the torque management bar is properly secured to the flange d Setting the system for rotation D1 e Set...

Страница 17: ...4 Position the adaptor on the valve and set up the torque retention system Consult the instructions for adaptors 5 Check the operator is correctly positioned in relation to both the actuator and the t...

Страница 18: ...at the accelerated fluid cleans any potential impurities from the valve then close it again at the desired torque 5 When the maximum open position is reached reclose with a few turns to avoid the valv...

Страница 19: ...of the actuator will be different so you need to select BJH01 for a standard duty Banjo head speed is divided by 4 or BJH02 for a heavy duty Banjo head speed is divided by 3 If you want to set a spec...

Страница 20: ...work health and safety regulatory provisions that apply and any local workplace safety instructions including conditions relating to the work environment clothing and the operator s individual protec...

Страница 21: ...ed as defective by our departments which parts shall have been promptly returned by the buyer to modec plants all carriage costs and duties paid enclosing a detailed description of the recorded breakd...

Отзывы: