Attach panels [16], [17] and panel [18] to panels [14] and [15]
and secure with 10x locking nuts (D). Tighten with a screwdriver.
Eclipse Change Table
Assembly Instructions
mocka.co.nz | mocka.com.au | PO BOX 6171, Maroochydore, QLD, 4558
8
14
Drawers x2
13
Insert 10x bolts (C) into panels [14] and [15]. Tighten with
a screwdriver.
C
C
C
C
C
C
C
C
C
C
D
D
D
D
D
3
15
3
14
3
16
3
18
3
17
3
14
3
15