QoS Application Guide
58
Web management:
Step1.
Go to Configuration -> Port Configuration -> Giga Port, and set GE-2 link speed to 100Mbps full
duplex.
Step2.
Select Configuration -> VLAN -> Static VLAN. Create a VLAN with VLAN ID 100. Enter a VLAN
name in the
Name
field. Here we set tagged VLAN100 on GE-1 and GE-2.
CLI configuration command:
interface gigabit 2
speed full-100mbps
exit
vlan 100 v100
interface gigabit 1
vlan 100 tag
exit
interface gigabit 2
vlan 100 tag
Содержание MLB-E4203-28-F
Страница 1: ...MLB E4203 28 F MLB E4204 28 G F 28 Ports L2 Managed Gigabit Switch USER MANNUAL ...
Страница 4: ...CONTENTS ii ...
Страница 5: ...1 Preface Scope Audience Safety Instructions Documentation Conventions ...
Страница 6: ...2 ...
Страница 8: ...Preface 4 ...
Страница 9: ...5 Overview Overview Panel Introduction Technical Specifications ...
Страница 10: ...6 ...
Страница 14: ...Quick Installation 10 Dimensions unit mm ...
Страница 16: ...Quick Installation 12 Quick Installation Equipment Mounting Cable Connecting Equipment Configuration ...
Страница 81: ...77 7 On the host with IP 172 16 100 10 could receive alarm trap which record link down up information ...