background image

 

MKS Instruments UK Ltd 

V2000-C/E Hardware Manual – SP102005.102 March 2013

 

 

 

29 

 

Inlet operation 

The Vision 2000C/E system has a special, closed ion-source.  
The optimum operating pressure of this source is 1x10

-3

 to 3x10

-3

 mbar (to 2x10

-3 

torr).  As the ion source 

pressure increases above the optimum, the peak heights become significantly non-linear - that is, they do not 
rise as much as the pressure. 
 
Monitoring processes at pressures higher than 5x10

-3

 mbar requires inlet pressure reduction.  The 3-valve inlet 

and high-flow 4-valve inlets accomplish this with a single stage of pressure reduction through the V2 path.  This 
method is suitable for inlet pressures up to about 10 torr.   
 
In select “fast-response” configurations, additional pumping is provided through V4 to O4.  Orifice O4 is a VCR 
gasket orifice at the UniBloc™ fitting that connects to the side-port of the turbopump.  Its size depends upon the 
factory configuration (typically between 0.007” and 0.031”).   
 

Do NOT disassemble this connection unless you have the proper replacement in-hand! 

 
For higher inlet pressures, a two-stage approach must be used, with additional pumping between the two 
sequential orifice stages, O2-1 and O2-2.  
The inlet pressures that can be sampled properly are determined by this configuration and the size of the 
orifices.  Again, differential pumping is obtained through V4 and O4.  Again, orifice O4 is a VCR gasket orifice at 
the UniBloc™ fitting that connects to the side-port of the turbopump.  Its size depends upon the factory 
configuration.  
 

Do NOT disassemble this connection unless you have the proper replacement in-hand! 

 
 
The state of the inlet manifold is process chamber pressure dependent.  This table summarizes the various 
conditions that it can take.  The RVC2 interlocks prevent opening a sampling valve (V1 or V2) when the inlet 
pressure exceeds the factory set-

point (except when overridden by turning Off the “Interlocks” with the key at the 

RVC).  The set-points are typically about 10-50% above the maximum intended inlet pressure for a given sample 
valve. 
 
 

 
System shut down procedure 

It is important to follow the procedure outlined below to shut down and switch off the Vision 2000C/E system. 
 
1. 

Switch off the RGA filament and wait for 15 minutes for the filament to cool down. 

 
2. 

Switch off the turbo pump from the RVC2 Window within Process Eye Professional, or by pressing the 
PUMPS switch on the RVC2. 

 
3. 

Switch off the RVC2. 

 
4. 

Allow the turbopump to come to a complete stop 

 
 

Содержание Vision 2000-C

Страница 1: ...Vision 2000 C E Manual SP102005 102 March 2013...

Страница 2: ...ticularly relating to any omissions or inaccuracies you may discover You can send your comments to MKS Instruments Spectra Products Cowley Way Weston Road Crewe Cheshire CW1 6AG United Kingdom 44 0 12...

Страница 3: ...MKS Instruments UK Ltd V2000 C E Hardware Manual SP102005 102 March 2013 3...

Страница 4: ...MKS Instruments UK Ltd V2000 C E Hardware Manual SP102005 102 March 2013 4...

Страница 5: ...MC and safety issues The vacuum system on which the analyser RF head is mounted must be earthed to a protective earth preferably to the same protective earth as the control unit Operation The equipmen...

Страница 6: ......

Страница 7: ...ecting the foreline and SurgeProtector valve 19 Heater jackets 20 MicroVision2 installation 20 ELECTRICAL INSTALLATION 21 Equipment rack 22 Interconnecting cables 22 CONNECTING TO THE PROCESS TOOL 23...

Страница 8: ...these boxes is described below WARNING WARNING boxes are used where failure to observe the instructions could result in personal injury or death CAUTION CAUTION boxes are used where failure to observ...

Страница 9: ...ar panel of the Microvision2 refers to Read all instructions carefully before use The control and signal ports are designed for connection to MKS Instruments accessories via MKS Instruments cables The...

Страница 10: ...mm H R C ceramic 250V AC characteristic T and compliant with IEC 127 Details of fuse types and ratings can be found in the RVC2 manual and printed on the rear panel Electrical Connections The Vision 2...

Страница 11: ...om the tool foreline when the RGA system pump is off and when the tool foreline pressure is above 3 torr WARNING The RGA system must never be operated without exhausting to a hazardous gas scrubbing s...

Страница 12: ...uments UK Ltd V2000 C E Hardware Manual SP102005 102 March 2013 12 System Options Fig 1 3 Valve Etch Configuration Fig 2 4 Valve Fast Response LPCVD Configuration Fig 3 4 Valve High Pressure CVD Confi...

Страница 13: ...r local MKS Instruments facility or sales service representative Carefully unpack the various parts of your Vision 2000 C E system Again check for any signs of damage Find the shipment report and chec...

Страница 14: ...n 2000C E has makes little difference to its installation On the face of the UniBloc inlet valve that connects to the RGA chamber is a ceramic CIS closed ion source coupling Exchanging an inlet valve...

Страница 15: ...MKS Instruments UK Ltd V2000 C E Hardware Manual SP102005 102 March 2013 15 Dimensions 490mm 225mm 265mm 340mm 166mm...

Страница 16: ...depending on working pressure 722 Baratron Gauge 2 LoVacOK 890B Gauge 3 UniBloc inlet assembly 4 Purge regulator assembly 3 5 to 8Bar Argon or dry Nitrogen supply required 5 System Interface Module 6...

Страница 17: ...e Manual SP102005 102 March 2013 17 Item Ref Description 8 Pneumatic Manifold assembly 60 80 psig dry air 9 Fore line connecting flange 10 Cable loom supporting bracket 8 9 10 Pneumatics supply Use ad...

Страница 18: ...MKS Instruments UK Ltd V2000 C E Hardware Manual SP102005 102 March 2013 18 Item Ref Description 15 V1 16 V2 17 V3 18 V4 19 UniBloc mounting face 20 16 15 17 18 19...

Страница 19: ...g response time can be improved by using a length of 1 8 OD PTFE tubing from the point to be sampled to the face of the UniBloc Be sure that the tubing material is compatible with the process gases to...

Страница 20: ...must be strictly followed Heater jackets The Vision 2000C E is supplied with two heater jackets fitted one on the main RGA chamber and another around the inlet valve assembly There is no need to remov...

Страница 21: ...s and regulations The electrical installation should be carried out after the vacuum system installation Please follow the next sections in sequence Electrical specification See the RVC2 and Microvisi...

Страница 22: ...n protective conduit e g plastic trunking that provides a good degree of protection according to the location of installation All cables are labelled at both ends All the connectors have been chosen t...

Страница 23: ...100 120 Volts AC 50 60 Hz 15 Amps 220 240 Volts AC 50 60 Hz 13 Amps LINE BROWN NEUTRAL BLUE EARTH GREEN YELLOW Computer connection Vision 2000C E systems are used in conjunction with MKS Instruments...

Страница 24: ......

Страница 25: ...mputer software The operation of the vacuum system controller is fully described in the Remote Vacuum Controller manual The pumps are switched on from the Remote Vacuum Controller window or from the R...

Страница 26: ...r will indicate when the pump is up to speed and the Turbopump indicator in the RVC window will change from yellow to green Note that the turbopump controller will be programmed to a set point of 95 o...

Страница 27: ...unt recipe in Process Eye and check that the probe gas is set to mass 4 for helium or the appropriate mass if you are using another gas As the Vision 2000C E uses a Microvision2 there can be an audio...

Страница 28: ...CAUTION The Electron Multiplier SEM MUST NOT be operated at temperatures above 90 o C Do NOT bake with the SEM selected After baking ends wait at least 2 hours before using the SEM The electron multip...

Страница 29: ...ween the two sequential orifice stages O2 1 and O2 2 The inlet pressures that can be sampled properly are determined by this configuration and the size of the orifices Again differential pumping is ob...

Страница 30: ......

Страница 31: ...the two flying leads coming from the gauge connector and measure the voltage Ensure that the process chamber pressure is below 1milli torr then check the meter reading If the indicated voltage is gre...

Страница 32: ...oval For system with compression springs note the following tightening procedure tighten these screws until the top of the screw head is flush with the top surface of the ceramic coupling springs will...

Страница 33: ...tron multiplier SEM detector will also require replacement In extreme cases this can be as soon as 3 months but 1 2 years is more typical For non corrosive gas sampling SEM performance is often accept...

Страница 34: ...f 6 o clock the standard analyser alignment pip orientation is at 9 o clock Remove the six x 28 bolts Carefully withdraw the analyser from the vacuum chamber Leave the old copper gasket in place until...

Страница 35: ...rned delays in providing this completed form will lead to delays in the servicing of the instrument Securely package all items to be returned using the original packaging where possible and send to th...

Страница 36: ...ease ensure that we have this information before we receive the equipment A copy should also be given to the carrier FAILURE TO COMPLETE THIS FORM OR COMPLY WITH THE PROCEDURE WILL LEAD TO DELAYS IN S...

Страница 37: ...ese substances Action to be taken in the event of human contact or spillage I hereby confirm that the only toxic or hazardous substances that the equipment specified above has been in contact with are...

Отзывы: